Skip to main content
Transparent
Rank 20
Rank 20
March 15, 2019
Tutorial

OVO SMETS2 (S2) Smart Meter installation - Member Guide

  • March 15, 2019
  • 60 replies
  • 91683 views
OVO SMETS2 (S2) Smart Meter installation - Member Guide

Updated on 17/04/26 by Abby_OVO

 

Member’s Guide to OVO SMETS2 (S2) smart meter installation

 

Having a new smart meter installed is something which most customers only experience once. This topic shows what the process involves and highlights particular issues with the newer SMETS2 meters which OVO started installing widely in March 2019.

You must be present for a smart meter installation. The engineer needs access to the house, even if both gas and electricity meters are in external enclosures. There is an initial survey of the state of gas appliances and your electric consumer unit. Photographs are taken and any gas boiler is turned off.

The electricity meter is usually changed first. The installer is permitted to snip the seal on the main fuse and can reseal it without needing to call your Distribution Network Operator (DNO).

 

ece44fa3-0693-4c6a-8339-412ab1a3af8b.jpg


Here my SMETS2 meter is indicated with a red arrow. This one is made by a US Company called Aclara. It has two buttons marked A & B rather than the keypad of the earlier SMETS1 meters, which were manufactured by Secure.

Above the meter itself there is a communications module (blue arrow) which allows data transfer via the mobile phone network. There are several versions. As I'm in a rural area of Devon with relatively poor signals, this Toshiba unit is a Mesh Network device. It connects to an external aerial via the wire marked with a green arrow.

 

bcff455c-f97b-47a8-ab19-e68458f4df72.jpg


The aerial is the tall rectangular box which is literally stuck onto the outside of the door.

Your gas meter may be in a wall mounted enclosure, or buried in a "semi-concealed" box as is mine.

The installer first removes the old meter including the round regulator (orange arrow), and then screws a steel mounting frame in place, shown here with a green arrow.

 

81ec209b-e31e-4321-be23-36ba8fff2a8f.jpg

 

The meter may seem a relatively large device, but it's actually two items. The actual SMETS2 smart meter is indicated with the red arrow, and slots into the larger outer body.

 

My new gas meter is manufactured by Uniflo. Because there is no electricity available, it contains an inbuilt Lithium battery which should last around 10 years. A gas smart meter spends most of its time in sleep-mode to conserve power, waking up every few seconds to send a signal to the SMETS2 electricity meter.

OVO have designed and fabricated right-angled steel pipes marked here with purple arrows. These minimise the height required and allow the enclosure lid to properly close.

During the commissioning process, the installer connects a manometer to the test point identified with the blue arrow. The gas pressure pushes the fluid up one side of the u-shaped tube. If it remains steady over a two-minute timed period, then there are no leaks.

The installation engineer will now take another set of photographs which get inserted into relevant places in the electronic "form" on his mobile phone. There is a minimum set of 23 pictures which must accompany any installation.

As the exact installation process may evolve over time, please note that these SMETS2 meters were installed on 11th March 2019.

 

This guide continues in the comments below, or click on the headings below to go directly to that comment:

 

Commissioning Process

 

Wifi Interference

 

Bill and Statements

 

Smart meter communications network

 

SMETS1 Upgrades

 

Taking a manual electricity reading

 

Taking a manual gas reading

 

I can smell gas!

 

Communications Hub - Toshiba

 

Communications Hub Device Variations - South & Central Territories

 

OVO member but not got a smart meter yet? - Book today!

Smart meter not communicating? Fill in this Online Form

Interested but not yet an OVO member? - Check out our plans!

60 replies

BPLightlog
Super User
Super User
July 25, 2023

Hi @Trebor54 , it sounds like they still have your old meter on the record. It can take a while for the details to update I believe 

Bring me Sunshine ~ E&E {Solar PV, Battery Storage, Hybrid EV, ASHP and Home Assistant automation}
Newcomer
June 21, 2024

I recently got a smart meter installed. Once  a month I was used to read the status of my electricity and my gas. The engineer set them both to zero when he installed the smart meter. I know want to see, how much gas and electricity I used since. I can see that for the electricity but not for gas. Is that me being stupid or is that a bug by design?

The Inhouse Display doesn’t help either.

Who knows more?

 

Thanks,

Wolfgang

Firedog
Super User
Super User
June 21, 2024

Please post clear photos of the electricity meter, the gas meter and the IHD. Then someone will be able to help you find your gas readings.

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |
Chris_OVO
Community Manager
Community Manager
June 24, 2024

Hey @writter,

 

@Firedog has made a great start in trying to offer support for you! If you could post some photos this would give us a better understanding of what setup you have installed. 

 

You can also check your readings through your online account at https://account.ovoenergy.com/meter-readings/history/gas

 

We also have some handy guides that might help below:

 

I hope this helps! 

Renewable energy jokes never get old.
Rank 5
March 14, 2026

Why is my smets2 gas meter being replaced.

Firedog
Super User
Super User
March 14, 2026

I don’t know - why is your smets2 gas meter being replaced?

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |
Nukecad
Super User
Super User
March 14, 2026

1- How old is it?

Some of the earlier SMETS2 meters may be reaching end of certification.

2- is the whole meter being replaced or just the communications hub (the top bit)?

Some 3G coms hubs are currently being replaced with 4G/5G ones.

I said, Hey - Watts going on.
Chris_OVO
Community Manager
Community Manager
March 16, 2026

Hey ​@Jacko6625,

 

We’d love to help you out, but we could use a bit more information. How did you find out that your meter is being replaced? It probably mentioned why it’s being replaced too. The more details you can share, the better we can support you.

Renewable energy jokes never get old.
Rank 5
March 25, 2026

Engineer turned up today nothing wrong with meter. Waste of his and my time. Don’t know why appointment was made . Said need new meter? Strange.

Ben_OVO
Community Manager
Community Manager
March 26, 2026

This sounds very strange ​@Jacko6625. If you get in touch with our Support Team they’ll be able to let you know what happened. Keep us updated!

Powered by the Sun