Failed smart meter installation, what next?

  • June 18, 2019
  • 120 replies
  • 6858 views

Booked a smart meter installation several months ago and an engineer turned up for the appointment. After an initial survey he advised that smart meters could not be fitted in my house because the existing meters were not separated. He then advised that a kit was available to sort this problem but to date I’ve had no follow up.
can anyone advise?.
Clive

Best answer by Amy_OVO

Updated on 29/10/25 by Ben_OVO


Engineer not turned up for your appointment? This topic might be helpful:

 

 

Sorry to hear that the engineer wasn’t able to complete your smart meter installation. It sounds like there’s an issue with your current set-up which needs to be resolved before we’re able to replace your meters.

 

It could be that your meter shares a fuse with a neighbour’s meter, which can happen if your meters are located in a shared meter cupboard or hallway. Read more about this and other issues which can prevent us replacing your meters on this guide.

 

To identify the exact issue in your case, we’d need to check the job report created by the engineer who visited your property. Reach out to our Support Team to check the next steps in getting the issue resolved.

 

Depending on the issue, you may have to contact your Distribution Network Operator (DNO) to carry out some work before rebooking your appointment. Our Support Team will be able to tell you if this is necessary.

 

Keep us updated as we’d love to hear the outcome of this one. Hoping it’s resolved quickly and you can enjoy the benefits of a smart meter soon! :relaxed:

 

OVO customer but not got a smart meter yet? - Book today!

Interested but not yet an OVO customer? - Check out our plans!

120 replies

Newcomer
May 4, 2023

Hi,

I was also told that I would be entitled to £30 last month when they didn’t show up to my April appointment either. 
Can I get an appointment where someone will show up please? I would like smart meters in my house. 
The bookings in April and May have both been no shows with no contact. 
Can someone ensure me that someone will actually turn up if I was to book another appointment? Or would I be better off changing to another company. 
thank you 

 

Jeffus
Rank 20
Rank 20
May 4, 2023

Hi,

I was also told that I would be entitled to £30 last month when they didn’t show up to my April appointment either. 
Can I get an appointment where someone will show up please? I would like smart meters in my house. 
The bookings in April and May have both been no shows with no contact. 
Can someone ensure me that someone will actually turn up if I was to book another appointment? Or would I be better off changing to another company. 
thank you 

 

Hi @Greycat

Welcome to the customer forum, i am just a customer like you.

Sorry to hear about the issues. 

No one on the forum can answer those questions as no one here can access your account, including all the OVO moderators. 

Your best option is to raise this via a phone call or chat. 

https://help.ovoenergy.com/#contact_us_container

 

Newcomer
January 10, 2024

We were due to have an engineer out today. They haven't shown up no contact or anything. How do I contact to find out what's happening as lines shut after slot did. 

BPLightlog
Super User
Super User
January 10, 2024

You could try Twitter or Facebook which usually does run later. 

Bring me Sunshine ~ E&E {Solar PV, Battery Storage, Hybrid EV, ASHP and Home Assistant automation}
Abby_OVO
Community Manager
Community Manager
January 11, 2024

Hey @Dragonb1 

 

I’m really sorry to hear about this.

 

Have you been back in touch with the Support Team this morning to have them rearrange the appointment? If not, please do get in touch with the team.

 

As the engineer missed the last appointment, you may also be entitled to £30 compensation, check out this page for more on this: https://www.ovoenergy.com/help/article/guaranteed-standard-of-performance-gsop.

Currently Playing: She's Electric
Newcomer
January 11, 2024

Good evening I tried on my lunch break today and the phone line crashed l, I thought the gentleman was going to call me back, but he didn't. 

Abby_OVO
Community Manager
Community Manager
January 12, 2024

Hey @Dragonb1 

 

Sorry to hear this.

 

If you’ve not had this re-arranged yet, then I’d recommend going to the Support Team via live chat to get this sorted.

Currently Playing: She's Electric
Newcomer
October 16, 2024

My Smart Meter installation failed.  I.e. did not work according to the installing engineer. He reinstated our old Economy Seven meter set up.  That was all a waste of his time and Ovo’s money.

What happens next?

Chris_OVO
Community Manager
Community Manager
October 16, 2024

Hey @John kent

 

I’m sorry to hear that the meter installation failed. Did the engineer give you any indication why the meter replacement failed? There could be a few possible reasons such as communication issues where the meter can’t join the network and therefore wouldn’t function properly. Are you a THTC or RTS customer that’s moving from one of those meters to a new smart meter? Apologies for all the questions just trying to get a better understanding of your circumstances. 

 

If you could share some photo’s of your meter setup that would really help us understand what setup you have and how best to try and help you. 

Renewable energy jokes never get old.
Rank 6
December 10, 2025

We’ve been going through major issues getting smart meters installed for the first time, and I was wondering if anyone else had experienced similar?

 

It’s seems to be almost entirely down to the ridiculous subcontracting system Ovo use which means each engineering visit is to do a specific job rather than just get the meters working. Each time the engineer identifies a new issue, instead of being allowed to fix it, it gets logged as a new job which needs another appointment.  We’ve had 7 visits so far, with a further one supposed to be scheduled soon.

The summary so far is:

Visit 1 (July 2025) - Installed meters and IHD, advised all would be operational in max 4-6 weeks. Result - working gas smart meter, no working electric or IHD

Visit 2 - Visit to perform full reset. Identified issue with electric meter. 

Visit 3 - Replace electric meter. Identified issue with comms module. 

Visit 4 - Replace comms module and recommission everything. Result - electric working, gas no longer working, IHD not working

Visit 5 - Replace gas meter, couldn’t get it to commission

Visit 6 - Identified replacement comms hub is the wrong kind (single band) and needs to be replaced

Visit 7 (December 2025) - Engineer arrived without a replacement comms hub. Replaced gas meter, couldn’t get it to commission, replaced gas meter again, couldn’t get it to commission. Advised us to book another appointment specifically requesting a full reinstall of both meters and the DB hub.

I submitted a complaint 2 weeks ago and have not heard anything.  Every engineer has said OVO should contact me for the follow-up appointment but that has never happened either.

To top it all off, I phoned OVO this morning and when trying to book the appointment they advised both smart meters are now working.  They said maybe the gas meter kicked in after the engineer left somehow?  Anyway, I still need a working IHD, and so appointment number 8 is going to be scheduled shortly….