I arranged for smart meters to be installed. great. engineer really good and helpful. Couldn't fit
electric due to meter being too old - asbestos fuses. was told that Scottish Power would contact me in order to change meter. Still waiting , no correspondence, no contact by phone, how do I find out what is happening
Best answer by Eva_OVO

Updated on 21/10/25 by Ben_OVO

 

Sorry to hear that we weren’t able to install your smart meters as planned. 

 

Why are asbestos backboards an issue?


In some properties, asbestos meter backboards were fitted. There are a number of safety issues with asbestos backboards, and if damaged, they can pose a serious risk to the occupants of the property. We're unable to remove or fit meters onto asbestos backboards, as there is a high chance that the asbestos would be disturbed and release dangerous particles into the air. Therefore, any job in which an asbestos backboard is present will be aborted by our engineers.

 

Who’s responsible for replacing a meter backboard?


As you can see on our great guide, the meter backboard is maintained by your Distribution Network Operator (DNO).

 

It sounds like Scottish Power Energy Networks are your DNO, so our engineer will have notified them of the issue.  The DNO should contact you to schedule in the necessary work based on it’s urgency, see the timeframes for each category below:

 

Category Timescale for DNO to attend
A Emergency - fix will be implemented ASAP, usually that day.
B 4-6 weeks
C 4-6 months


Unfortunately we cannot speed any of these up - as they are decided by the DNO, although if you’re still waiting to hear from them it might be worth contacting them directly to check when the maintenance work will be scheduled.

 

You can find out more about DNO’s (including their contact details) on our DNO guide.

 

I’ve had the meter board replaced - How do I re-book a smart meter exchange?

 

Great news! You can usually re-book a smart meter appointment on your online account or OVO app (download for Android or iOS). If you’re unable to do this here, reach out to our Support Team (they may need to log that the asbestos has been removed before booking).

 

You’ll soon be able to enjoy the benefits of a smart meter!

 

OVO customer but not got a smart meter yet? - Book today!

Interested but not yet an OVO customer? - Check out our plans!

36 replies

Mw2870
Newcomer
Newcomer
October 30, 2018

Hi @andycornerpost, welcome to the forum!

Are ScottishPower Energy Networks the distribution network operator for your address?
Maybe the best bet is to get in touch with OVO first and see if they know what is going on.
You can contact the team on FacebookTwitter and the Help centre has online chat!

Eva_OVO
OVO Staff
Eva_OVOSolved
OVO Staff
November 1, 2018

Updated on 21/10/25 by Ben_OVO

 

Sorry to hear that we weren’t able to install your smart meters as planned. 

 

Why are asbestos backboards an issue?


In some properties, asbestos meter backboards were fitted. There are a number of safety issues with asbestos backboards, and if damaged, they can pose a serious risk to the occupants of the property. We're unable to remove or fit meters onto asbestos backboards, as there is a high chance that the asbestos would be disturbed and release dangerous particles into the air. Therefore, any job in which an asbestos backboard is present will be aborted by our engineers.

 

Who’s responsible for replacing a meter backboard?


As you can see on our great guide, the meter backboard is maintained by your Distribution Network Operator (DNO).

 

It sounds like Scottish Power Energy Networks are your DNO, so our engineer will have notified them of the issue.  The DNO should contact you to schedule in the necessary work based on it’s urgency, see the timeframes for each category below:

 

Category Timescale for DNO to attend
A Emergency - fix will be implemented ASAP, usually that day.
B 4-6 weeks
C 4-6 months


Unfortunately we cannot speed any of these up - as they are decided by the DNO, although if you’re still waiting to hear from them it might be worth contacting them directly to check when the maintenance work will be scheduled.

 

You can find out more about DNO’s (including their contact details) on our DNO guide.

 

I’ve had the meter board replaced - How do I re-book a smart meter exchange?

 

Great news! You can usually re-book a smart meter appointment on your online account or OVO app (download for Android or iOS). If you’re unable to do this here, reach out to our Support Team (they may need to log that the asbestos has been removed before booking).

 

You’ll soon be able to enjoy the benefits of a smart meter!

 

OVO customer but not got a smart meter yet? - Book today!

Interested but not yet an OVO customer? - Check out our plans!

My friend told me how electricity is measured and I was like Watt!
Newcomer
July 8, 2020

Hi - I’ve been told that my house has a pre-1937 fused neutral cutout (which has asbestos). According to my sparky, this needs to be replaced within 28 days or it’s in breach of HSE rules. I reported it to Ovo 2 weeks ago now, and still no sign of any appointment to fix it. 

 

Has anyone else had any luck getting Ovo to deal with one of these?

Amy_OVO
Retired Moderator
Retired Moderator
July 9, 2020

I’ve moved your post here, @killicrankie, there is some handy info above. You’ll need to contact your DNO for help with this. If you need help finding out who your DNO is, check out this topic!

Thanks! 

OVO-Joyed to help!
Transparent
Rank 20
Rank 20
July 9, 2020

Hi @killicrankie - I agree with @Amy_OVO.

The incomer fuses and isolation block are the property of your Distribution Network Operator (DNO). It’s their responsibility to bring them up to the correct specification.

If there’s no other “faults” on your side of the existing meter, then there shouldn’t be any cost incurred by you.

Save energy... recycle electrons!
Tim_OVO
OVO Staff
OVO Forum Legend
July 9, 2020

Good advice here, it is the DNO that will need to visit to upgrade the cut out.

 

In some cases it might need to be an urgent DNO visit. But the DNO won’t know this until they’re told by the supplier. So it’s good to have the supplier visit to perform a ‘site survey’ job, (or just book in a free smart meter appointment if you don’t have one of these already), and the engineer can assess the cut out whilst they’re there, notifying the DNO of the job’s urgency. 

 

Disclaimer: some circumstances will mean that smart meter appointment can’t proceed until the DNO visit. In this case, we’d simply re-book the appointment after the DNO visit. 

 

Hope this help,
Tim

 

 

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Newcomer
July 9, 2020

Hi all,

 

Thanks for your useful comments on this. I already spoke to the DNO a good couple of weeks ago and they told me that the request had to be raised by my supplier, in this case Ovo, using a B11 flow.

After requesting this and follow on conversations with Tim today on the phone (many thanks!), it turns out Ovo can’t raise the request without a site visit themselves. 

Anyhow, it’s all booked in now with Ovo, then hopefully I can book in the DNO, then Ovo again, then I’m all up to date. Simple!

 

Tim_OVO
OVO Staff
OVO Forum Legend
July 10, 2020

@Transparent this is a quality bit of resource, I’d like to make this it’s own topic - any objections?

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Transparent
Rank 20
Rank 20
July 10, 2020

Sure - that’s fine by me.

And I’d also like to know who is @killicrankie’s DNO. (Please fill out your Forum Profile!) We know that their approach differs across the country. Indeed, Kaluza had to comply with stipulations (and additional costs!) from two of them when installing the V2G chargers.

So if this is a separate Topic, we can start to build up a picture of which DNO’s require specific action to be taken, and which are more accommodating to enquiries from customers.

Save energy... recycle electrons!
Newcomer
July 10, 2020

Hi @Transparent,

That’s useful information. I was aware of the regulation that this should’ve been replaced by 2013 (we missed that my a little!) and of the 28 day timescales for the work, but it’s good to know that it’s not immediately dangerous.

My DNO is UK Power Networks, covering London.

It does seem strange to slow the process down by going through the supplier. It’s now 17 days and counting since reporting to Ovo, though this is partly due to the pandemic, it would be great if the Ovo customer support guys were more aware of regs on this and didn’t just say “call back in 2 weeks”.