Meter tails too short, who should pay

Ovo came to install a new smart meter, as the meter tails were too short they did not want to do the job, eventually after much discussion with Customer Care they want to charge me about £200 to install longer ones. I do not want or need this change other than to install their smart meter.

I think this is not my cost to bare, the distance between cut off and existing legacy smart meter is about an inch…

 

 

 

8 replies

Blastoise186
Super User
Super User
Nov 18, 2026 2:12 PM UTC

Howdy ​@gduk !

Shared Responsibility I’m afraid! The tails from the main fuse/service fuse from the street to the meter are for OVO to cover and pay for, but the tails from meter to consumer unit are for you to cover and pay for.

1 Inch is 2.5cm short which is unfortunately too big a gap to do the install safely. I’ll see if ​@Lukepeniket_OVO has any thoughts, but I suspect it’s a shared responsibility case.

This will probably need lengthening anyway to allow enough space for a meter to fix regardless - there’s not enough space to fit a new meter in the exact spot the current one is in - but that lovely space to the right is ideal and can fit lots of kit easily.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
gdukAuthor
Rank 2
Nov 18, 2026 2:34 PM UTC

The thing is they need to move the existing meter before I can lengthen the tails to the consumer unit, so for sure they need to go first. Otherwise I can just not have a working smart meter I suppose.

 

What is more worrying is Customer Care told me that I should get my sparky to move the meter

gdukAuthor
Rank 2
Nov 18, 2026 2:46 PM UTC

I meant to add that Ovo wanted me to pay for them to extend their tales, not mine.

Blastoise186
Super User
Super User
Nov 18, 2026 3:31 PM UTC

It’s ultimately one job. You’re looking at a Meter Reposition anyway, which is £166 for Single-Phase per 

Only OVO can do that job - your sparky cannot and should refuse it.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
gdukAuthor
Rank 2
Nov 18, 2026 4:00 PM UTC

That does not make sense, new meter is bigger so they need to reposition it. If they want me to use a new smart meter then they need to do what is necessary. I am fine to continue to submit manually meanwhile. It seems a bit much to expect that the new meter would fit in the space of the old one anyhow.

 

The engineers initial advice was for us to move the meter as mentioned above, then had a whole thing with customer care who said that Ovo does not touch tails, which is obviously not true. So if installing a new meter requires lengthening of tails you would think that is their remit to undertake.

 

Anyhow thanks for commenting

Nukecad
Super User
Super User
Nov 18, 2026 5:17 PM UTC

We need to ask who was it that asked for the meter to be replaced.

Did you request that the meter be changed to a smart meter?

Or was it OVO said that the meter has to be replaced because it is out of certification? (I can't see the meter date on that photo).

It does make a difference.

In the first case if you have requested the meter swap before it is needed by law - meaning that is non-essential work - and so the repositioning / longer tails needed  will be at your cost. (or at shared cost if agreed).

However in the second case then as the swap is needed by law because the current meter is out of certification then it is essential work and OVO should do the required work at no cost* to ensure that you have a certified meter.

*It doesn't look to be the case here  because it looks like an SM will fit in that cupboatd, but I think that they can still charge if meter relocations of further than 1 metre are needed. (That's basically classed as a new supply and the DMO has to be involved).

Out of beer error >>>> Recovering memory.
gdukAuthor
Rank 2
Nov 18, 2026 5:48 PM UTC

No idea of its out of certification, how can I tell?

Better image below 

 

gdukAuthor
Rank 2
Nov 18, 2026 5:55 PM UTC

Google says i got 2 years left, I think we're splitting hairs at this point then. As previously mentioned they need to extend the tails to put a new one anyhow.  Thanks for taking the time to educate on this