Can I get a replacement for my broken smart meter In-Home Display (IHD)?

  • June 6, 2018
  • 89 replies
  • 10009 views

The title pretty much says it all.

I looked up the website on the Pipit documentation - www.securetogether.com - and they don't seem to exist any more.

Do OVO have spare Pipits?

Best answer by

Updated on 14/10/25 by Ben_OVO

 

Sorry to hear that you’re having issues with your smart meter Pipit In-Home Display.

 

If the device is faulty we’ll happily replace it but we’d need to carry out some trouble-shooting first.

 

If it’s missing usage information for one or both fuels this could indicate a communication issue with your smart meters. It’s worth checking the ‘usage’ pages on your online account or OVO app (download for Android or iOS) to see if the data is missing here (see below). If so this might explain the issue. Rather than replace the IHD we’d advise you carry out a smart meter health check for your meter type below:

 

 

If you can see you smart meter readings are being received but the usage data isn’t showing on the IHD, the device might be out of range. Move it as close to your electricity smart meter as possible and reboot. If this fails to sort the issue contact our Support Team, who may need to re-pair the device to the meters.

 

If the device is blank or not turning on, it may be out of battery. Check that the device is plugged in to the mains before attempting to reboot. If this fails then reach out to our Support Team who can request a free replacement Chameleon IHD (available for SMETS1 or SMETS2 meters). Bear in mind that there might be a waiting list for delivery. In the meantime you can still check the same smart meter usage data using your online account

If there’s physical damage to the device (ie a cracked screen) or it’s been lost there may be a £28 charge for a replacement. Our Support Team can advise on whether this charge would apply and get a new IHD requested.

 

OVO customer but not got a smart meter yet? - Book today!

Interested but not yet an OVO customer? - Check out our plans!

89 replies

Transparent
Rank 20
Rank 20
October 9, 2020

You’ve provided me with more information in 2 days than I got from OVO in the last 8 months.

That’s because your question is better suited to the Forum than it is to the Customer Services route.

I’ve visited OVO’s Bristol HQ on a number of occasions, seen how the CS Team work, and spoken to some of them. The initial weeks of training are very high quality, but this really only covers the basics of how the systems work, company policies and the Ofgem regulations under which they must operate.

What’s missing is the element of in-post training, after a few months on the job. They actually need to see a Smart Meter installation, talk to a Distribution Network Operator planner, and then visit a hydro-electric station and a substation. I’ve done all those in the past year; so I can bring those experiences back here to the Forum.

It’s an issue which OVO needs to address and I expect the Moderator, @Tim_OVO will want to raise this with the new CS Dept Manager who will shortly be in post.

 

It’s not that common for an OVO customer to have a Chameleon IHD with a SMETS1 meter installation. I wonder if CS have been trying to find the wrong model for you?

Even so, there is a major difference between the audited stocks of meter components which get installed on-site by engineers and the “spares stock” available. That’s because the Installation Engineers work within the Kaluza side of the business rather than the Retail Sales division.

Kaluza operates as a separate commercial entity, whereby its resources can be “bought in” by third-parties. So, for example, their engineers can be contracted to another Energy Supplier.

In your case this means that OVO Energy Retail must supply you with the replacement IHD and provide the support to get it paired.

 

Now you have a bit more of the background, you might feel yourself suitably armed to re-contact CS, using one of the methods on their Help Centre.

Let us know how it goes.

Save energy... recycle electrons!
Tim_OVO
OVO Staff
OVO Forum Legend
October 12, 2020

I’ve moved your topic over to this existing thread, @Madsocks79 and updated the best answer (at the top) with the latest. It’s not great to hear of your experience this year, trying to get reliable info on your IHD options.

 

It can be tricky for an agent to know the latest info on stock volumes of these IHDs, which our in house engineer team Field Force (it’s not part of Kaluza FYI @Transparent) aren’t providing when they fit the SMETS2 Aclara or Honewell/Elster smart meter, instead they fit SMETS2 IHDs  

 

I’ll do some digging on time frames and latest stock volumes and aim to update the best answer of this topic again once confirmed. Could you help me by letting us know the latest advice from the Support team @Madsocks79 ?

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Newcomer
October 12, 2020

I’ll do some digging on time frames and latest stock volumes and aim to update the best answer of this topic again once confirmed. Could you help me by letting us know the latest advice from the Support team @Madsocks79 ?

 

Let’s put it this way, I’ve had absolutely nothing from them, which has been the norm since February 2020.  It’s just the usual “you’re on a waiting list”, “don’t know when we are getting stock in”.


They’ve never asked what type of IHD it is, they’ve not confirmed if my SMET1 meter has been migrated under the DCC.  They’ve basically just regurgitating the same information just to fob me off.

 

I emailed them last week about the possibility of getting a SMET2 meter installed, but unsurprisingly I’ve yet to receive a response.


So good luck to anyone who has a broken IHD and needs a replacement, you will be waiting a looooooooooooooooooooooooooooooooooooong time to get one.

 

I’m sick of emailing them to be honest; my contract is up mid december so if I can get confirmation that my SMET1 meter has had the migration to DCC done so I can take it to other suppliers, then I’m just going to cancel my OVO contract and go somewhere that I’ll actually be wanted; maybe Octopus or somewhere else.

Transparent
Rank 20
Rank 20
October 12, 2020

@Tim_OVO wrote:

our in house engineer team Field Force (it’s not part of Kaluza FYI)

Well I was told this on two occasions by OVO Installation Engineers last year (2019). Was the move to work within Kaluza mooted and then rescinded?

Save energy... recycle electrons!
Tim_OVO
OVO Staff
OVO Forum Legend
October 13, 2020

Thanks for this honest feedback, @Madsocks79 - I’m still trying to get an update on stock:

 

I’ll do some digging on time frames and latest stock volumes and aim to update the best answer of this topic again once confirmed. Could you help me by letting us know the latest advice from the Support team @Madsocks79 ?

 

My contact is back ‘in the office’ today I’ve heard, so leave that with me. 

 

@Tim_OVOwrote:

our in house engineer team Field Force (it’s not part of Kaluza FYI)

Well I was told this on two occasions by OVO Installation Engineers last year (2019). Was the move to work within Kaluza mooted and then rescinded?

 

Yes a restructure has taken place since then @Transparent - all change in OVO world :rainbow:

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Newcomer
October 13, 2020

Thanks @Tim_OVO, appreciate the assistance.

Tim_OVO
OVO Staff
OVO Forum Legend
October 13, 2020

Hi @Madsocks79 me again!

 

I’ve been advised that for Secure Liberty smart meters, with faulty Chameleon IHD3, you have two options currently:

 

  1. A remote back-end action to try and reconnect and fix issue. Our Support team can help with this. 
  2. A Pipet IHD to be sent out (currently low stock). Our Support team can add you to a list to be sent one.  
  3. We’re not sure if it’s a good solution to recommend buying a Pipet yourself. These are supposed to be provided by us, free of charge.

 

One ray of hope it the possibility of IHD6s being available for all smart meters once upgraded, at some point in the future. These will be the latest model so supply chains will be in fine working order. I am offering no promises, but in my opinion, the online account with a half-hourly reads smart meter is better then a Pipet anyway….

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Newcomer
January 8, 2021

Had a Smart Meter installed on 7 December. The display did not work and I was told to wait 24 hours but still not working. Called OVO who told me I would get a new display in  4 weeks!.  Called them today as I still do not have the display and I was told that basically there is a backlog and, although I am high up on the list, they have no idea when I will get the display meanwhile, though, I an log on to my account to see my usage!).

I have only just moved to OVO because I thought Symbio were bad - now having second thoughts. 

Blastoise186
Super User
Super User
January 8, 2021

Hi @laurencemartin ,

Sorry to hear of the trouble. OVO isn’t the only supplier to use the Chameleon IHD3 and IHD6 as it’s a pretty common model. Chameleon Technology has been struggling to keep up with the huge demand recently but they’re working to restore supplies and OVO is working to restock them as fast as possible.

In the meantime, you can try to check your usage using MyOVO and the OVO Energy app. It’s not quite as elegant, but it should do the job. If you still want usage data now, there are alternative workarounds that might be possible but they’d be at your own risk.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Transparent
Rank 20
Rank 20
January 11, 2021

Hi @laurencemartin - could you elaborate on what you mean by

The display did not work

Our advice would be different depending on whether it is simply displaying erroneous data or if the display screen is completely blank!

Save energy... recycle electrons!