Help / advice for getting RTS meters changed after failed and cancelled appointments?

  • May 19, 2025
  • 20 replies
  • 756 views

Grateful for any advise/suggestions.

I’ve been trying to get the 2 electricity (under THTC tariff) meters changed since I could first book an appointment in October 2024.  An Engineer did appear at this first attempt in October 2024.  He tried to install a smart meter (with economy 10 tarriff) but the signal was an issue.  Subsequently, I have had to keep phoning OVO to find out what was happening - OVO have never contacted me even though I have been told a numerous times they would be in touch.  I have twice more booked appointments in January and today which have been cancelled.  The first one I was told it was a wider area network (WAN) problem and OVO would be in touch in 8 weeks - this didn’t happen.  I phoned intermittently and was told the problem hadn’t been resolved until I phoned at the end of April.  Today the appointment got cancelled again for a system reason - I am still not clear if the WAN problem has been resolved.  I tried to re-book an appointment today but all the appointments had gone and there is nothing left before the 30th June.  I was told someone would contact me within 2 weeks - I do not believe this as it hasn’t happened before.  I was told by the operator that because it is not my fault the meters have not been changed that I would not lose electricity supply - I have little faith in this happening and dread an electric bill after the 30th of June.  What should I do now?

I don’t understand why other options such as installing the smart meter in dumb mode (where I submit the meter reading) could be tried?  Are there not other options such as different meters?

Should I contact OFGEM or Citizens Advice?

Thanks for your help.

Best answer by Firedog

Updated on 29/05/25 by Ben_OVO

It is utterly incompetent. 

It’s sad to read this litany of failure. I just wonder how helpful it is. It might be better to keep emotion out of the equation and look for a way forward.

For a start, it’s always a good idea to be precise. Did an OVO support agent actually say “… we do realise smart meters don’t work in your area”? It’s a meter’s job to measure; only if it fails to measure can it be said to be not working. It could well be that meters in Glenprosen have difficulty connecting to the smart meter network (the WAN), but that doesn’t mean that they’re not working.

Next, OVO only supplies domestic customers; you seem to be operating a business, which agents aren’t trained to support. Domestic customers usually consist of a single-household single-supply arrangement. This makes it possible to assign a unique username and phone number to each customer. This might explain why your phone calls aren’t automatically routed to the right place within the OVO organization as they would be for an ‘ordinary’ domestic customer. 

You say that “SSE insisted on fitting smart meters to other properties a while back. They don’t work.” SSE’s retail business was bought by OVO back in 2019, and a great deal has changed in the years since then. Again, by ‘don’t work’, do you mean that  they don’t communicate? 

OVO won’t know what sort of electrical installation is in place at your properties - unless you tell them, that is. This would at least avoid preventable mistakes like not having the right sort of meter to fit. A system with energy stores like night storage heaters and insulated hot water tanks would often benefit from a meter capable of supplying offpeak power at reduced rates, for example. It would be really helpful for hard-pressed meter installation engineers to have this sort of information, along with photos showing the current equipment and its location within the property. It would be good to know the meter’s location vis-à-vis the TV transmission tower (probably the Angus tower north of Dundee) and nearby mobile phone network masts, because communication failures can sometimes be mitigated by local adjustments to improve reception.

Ofgem doesn’t listen to complaints from individual customers. If the supplier isn’t able to give satisfaction within a couple of months, a complaint can be referred to the Energy Ombudsman for decision. See Want to make a complaint? | Our complaints procedure | OVO Energy.

Last, the RTS switch-off will not now as originally planned take place on 30 June unless the equipment breaks down. Instead, the service will be phased out by area between then and 30 September, in the hope that the great majority of those likely to be affected will have alternative arrangements in place before the next heating season begins. There is no guarantee, then, that the signal won’t be switched off for your properties on 30 June, so that’s the deadline you should work towards.

I’m sure I could say more, but I’d just urge you to do what you can to help OVO’s staff help you.

 

20 replies

Blastoise186
Super User
Super User
May 19, 2025

Hi ​@khr ,

The actual deadline is September 2025. There’s new kit rolling out right now, so you may want to check again as the new kit fixes most WAN issues up north.

Otherwise, try https://ovoenergy.com/feedback 

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
khrAuthor
Rank 1
May 20, 2025

Thank you Blastoise186.  I hope the new kit works and relieved the deadline is a bit further off.  I am sorry you have to work so hard finding this information out as a volunteer. It would be much better if the OVO staff/Call Operators were as informed as yourself especially on the RTS specific phone line.  It has been extremely frustrating over the lack and poor communication from OVO.

Blastoise186
Super User
Super User
May 20, 2025

There is a dedicated team known as Squad 70 who should be fully clued up on this stuff - and that’s the one you should have been dealing with the entire time.

I will see if we can get this fed back to internal teams as I’m concerned about your experience. One of the perks of being a Forum Volunteer - we can ask the Forum Moderators to fling stuff around the office if we feel it’s needed.

As for myself? Well, lets just say I’m incredibly well informed because I’ve got industry contacts...

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Nukecad
Super User
Super User
May 20, 2025

Things are moving quickly with RTS, potential problems were known and waiting for new solutions, new problems are being identified ‘in the field’.
New solutions are being implemented ASAP. eg the new type communications hubs now becoming available.

As always with such ‘migrations’ the easier cases get done first, then the more tricky ones, the most difficult ones tend to be last. (But do have the experience gained from all the ones already done).

It’s moving that quickly that what was the best advice one week may be different the next week, and the general support agents can’t keep up with everything that is changing.

Remember that the general support people have to do their normal job of dealing with the usual range of daily customer queries, and they may not see many RTS queries at all.

I said, Hey - Watts going on.
Newcomer
May 27, 2025

I’ve been asking for appointments for 3 months now to change 4 RTS meters. SSE insisted on fitting smart meters to other properties a while back. They don’t work

First time, fair enough “we do realise smart meters don’t work in your area but we don’t actually know what’s happening, try again next month”. This is the only person I’ve spoken to who seemed to have accurate, if inadequate, information

Get letter  from OVO, make an appointment for 3 of the properties. Rang up & got appointment for 3 10 days ago. Was told a dumb meter would be fitted and only 1 tariff available. Economy 10. Agreed it for all 3.

Engineer came. I left him at the property, he said he’d only have time for this one . I didn’t check till 2 days ago. He’d fitted a new junction box, nothing else. Coincidentally I got another letter from OVO today telling me to make another appointment for this property.

Meantime I’d made an appointment for the remaining three for today. They are all holiday cottages and as well as my wasted time I have to withdraw them from bookings for a minimum of 3 days costing me around £2000. Engineer came 5 minutes before end of her first 2 hour window. She confirmed no new meter in the first property & looked at 2 of the others (no time for the 3rd). She spent 1 hour on phone to her bosses explaining that she did not have the right sort of meter to fit. I have no criticism of her, she was very helpful and sympathetic, but she’d been sent out with the wrong information.

I followed up that second letter from OVO requesting an appointment for the first property. Highly unsympathetic lady who said she’d been told this morning that they were not fitting dumb meters any more, but traditional meters and time clocks. I queried why the engineer had been sent out without this information and asked to raise a complaint. She refused to accept a complaint saying any complaint had to go to Ofgem. 

I have wasted hours of my life on this making appointments, waiting for engineers being told utter rubbish by OVO staff. The first I hear of the programme being delayed till Sept is this thread.

It is utterly incompetent. If Squad 70, or whoever know what’s happening why doesn’t everyone in OVO who handles these matters? I remember now, my first contact did say there was a team dealing with RTS meters, I guess this squad. She gave me a phone number. It went straight through to the normal OVO call centre.

Firedog
Super User
FiredogSuper UserSolved
Super User
May 27, 2025

Updated on 29/05/25 by Ben_OVO

It is utterly incompetent. 

It’s sad to read this litany of failure. I just wonder how helpful it is. It might be better to keep emotion out of the equation and look for a way forward.

For a start, it’s always a good idea to be precise. Did an OVO support agent actually say “… we do realise smart meters don’t work in your area”? It’s a meter’s job to measure; only if it fails to measure can it be said to be not working. It could well be that meters in Glenprosen have difficulty connecting to the smart meter network (the WAN), but that doesn’t mean that they’re not working.

Next, OVO only supplies domestic customers; you seem to be operating a business, which agents aren’t trained to support. Domestic customers usually consist of a single-household single-supply arrangement. This makes it possible to assign a unique username and phone number to each customer. This might explain why your phone calls aren’t automatically routed to the right place within the OVO organization as they would be for an ‘ordinary’ domestic customer. 

You say that “SSE insisted on fitting smart meters to other properties a while back. They don’t work.” SSE’s retail business was bought by OVO back in 2019, and a great deal has changed in the years since then. Again, by ‘don’t work’, do you mean that  they don’t communicate? 

OVO won’t know what sort of electrical installation is in place at your properties - unless you tell them, that is. This would at least avoid preventable mistakes like not having the right sort of meter to fit. A system with energy stores like night storage heaters and insulated hot water tanks would often benefit from a meter capable of supplying offpeak power at reduced rates, for example. It would be really helpful for hard-pressed meter installation engineers to have this sort of information, along with photos showing the current equipment and its location within the property. It would be good to know the meter’s location vis-à-vis the TV transmission tower (probably the Angus tower north of Dundee) and nearby mobile phone network masts, because communication failures can sometimes be mitigated by local adjustments to improve reception.

Ofgem doesn’t listen to complaints from individual customers. If the supplier isn’t able to give satisfaction within a couple of months, a complaint can be referred to the Energy Ombudsman for decision. See Want to make a complaint? | Our complaints procedure | OVO Energy.

Last, the RTS switch-off will not now as originally planned take place on 30 June unless the equipment breaks down. Instead, the service will be phased out by area between then and 30 September, in the hope that the great majority of those likely to be affected will have alternative arrangements in place before the next heating season begins. There is no guarantee, then, that the signal won’t be switched off for your properties on 30 June, so that’s the deadline you should work towards.

I’m sure I could say more, but I’d just urge you to do what you can to help OVO’s staff help you.

 

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |
Chris_OVO
Community Manager
Community Manager
May 28, 2025

Hey ​@Glenprosen,

 

Please accept our apologies for the difficulties you've encountered. The RTS shutdown has presented significant challenges for many, and we empathise with the frustration our members have experienced due to frequently changing information.

 

@Firedog has raised valid points. OVO does not offer business or commercial plans. If you are generating income from the properties, it is recommended that you seek a supplier that provides such contracts. Currently, you are in breach of your contract terms, which could lead to further complications.

 

Regarding the meter replacement, the shutdown process has unfortunately revealed unforeseen challenges that our infrastructure and metering teams are diligently working to resolve. While we are actively developing solutions for all scenarios, there may be instances where an engineer will need to abort an installation if completion is not possible. These situations are reported through our engineering systems, allowing us to explore alternative approaches.

 

Renewable energy jokes never get old.
khrAuthor
Rank 1
July 10, 2025

Just wanted to give an update, as I’ve had another frustrating day on trying to get my meters switched and just wanted to warn others. 

I yet again had to contact OVO to book an appointment as no one had contacted me within 2 weeks.  A few days later I found out SSE were doing a planned shut down of power to do work on a local transformer, on the day of the Engineer’s appointment.  Phoned the RTS hotline number thinking I would need to change the appointment but was told this was ideal and Engineers did not need the power on to test it was working.  I was very surprised at this and am kicking myself that I did not insist on changing the appointment.  I recognised the Call Operator voice as someone I had spoken to before (particular accent and confident manner).  This Call Operator had reassured me previously on booking one of the previous abortive appointments that the problem with my meter installation had been resolved, when it had not.

And you’ve guessed it, the Engineer turned up today and could not install the smart meter with out the electricity supply.  I now have to try and book another appointment.  On the positive, the Engineer is confident that he can install the smart meter and it will work with the new cell technology (like a sim card using mobile phone signals).  Well I hope it works as I’m hearing locally about smart meters not being reliable and breaking down,

Ben_OVO
Community Manager
Community Manager
July 11, 2025

Morning ​@khr,

 

I’m really sorry to hear this, it’s a shame to hear that this misadvice caused you to wait in, and for OVO to send an engineer out unnecessarily. I’ll make sure this is fed back internally.

 

I’m happy to hear that the engineer was confident about the next visit, and please do keep us updated as to how it goes. Fingers crossed for a positive outcome next time round! 🤞

Powered by the Sun
khrAuthor
Rank 1
August 23, 2025

Please see previous threads for background, I couldn’t seem to add to the above thread.

Update  

This time a SMS Engineer was unable to install a smart meter to replace the 2 RT meters (under THTC tariff) last week. 

He had to go through the procedure again of trying the system using WAN (Wider Area Network) signal just in case it was working - there was no WAN signal.  I understand they might have to go through this procedure again on the next appointment.  I do wonder if a signal from WAN is achieved, will the WAN continue to work and switch the heaters/hot water on/off with the Economy 10 programme?

There seems to be a problem with the new cell system using 2G/3G, that the previous Engineer had suggested would work on last failed appointment.  OVO apparently won’t be using 2G/3G cell hubs at the end of the year which means the meter would need to be changed again if it had been installed.  From information from my mobile provider the 3G network is being switched off in my area this month.  

 It also appeared that the OVO team liaising with the Engineer last week (I saw the text replies) were trying to get my meters changed to a dumb mode smart meter which was not programme to economy 10 and would have left me on a single tariff expensive rate and not switching storage heaters/hot water on/off.  To me this was leaving me in the situation of one of the scenarios as claimed if the RT had stopped working.  As the RT is working why leave me in this situation? .Was this just to reduce OVOs fines on not installing/switching enough smart meters?

I note on other threads going back a few months in the forum, 4G hubs should be used with a preprogramme economy 10.  The Engineer did not have this in his kit.  Why was I not offered this?  How long is 4G going to last?  Are there any other options?  What meter/communication hub should I be asking for?  I would be wonderful if there was an option without a smart meter,  

To anyone else with similar problems, I now understand the Radio Transmitter is not just about to stop working.  Some areas the RT is about to be controlled to switch off if there are no old meters still to switch.  I find this unlikely in  the Highlands.

Eventually, I want to change the heating and hot water system to something more efficient but at the moment I can’t with the 2 meters system.  I feel I am stuck with OVO but not getting unbiased and clear information to make an informed decision. I am not sure I’ve understood all this correctly and am left confused which is perhaps what is intended. 

I hope this information is useful to others.  Thanks to anyone who can answer the questions.