Skip to main content
Best answer by Transparent

Updated on 26/06/24 by Emmanuelle_OVO:

 

Do OVO offer 3 phase smart meters?

 

3 phase (aka polyphase) installations in domestic properties are few and far between, so it's a minority of meter engineers across the country that have the skills required to complete these installations. There are also some technical challenges in making sure your job is allocated to an engineer with these skills but we are just as keen as you are to have Smart available for these sites ASAP, so if you would like to take part in this beta stage release, please consider the steps below:


If you have a single rate 3 phase meter (i.e. not Economy 7 / 2-rate etc.) we would encourage you to book a smart meter appointment as normal online or over the phone on 0330 303 5063. 


This will then go through to a specialist team who will validate that it is single rate job and that an 3 phase engineer is available in your region. If this is the case, they will re-book your appointment with the right engineer. (So please bear in mind your appointment date/time will likely change, but we'll try to keep it the same where possible.)


Unfortunately, if you have a 2-rate meter or are not in an area covered by our current crop of 3 phase skilled engineers, you will need to continue with your heritage meter. We know this will be frustrating, so we are sorry about that, we are working to expand our coverage and by you flagging your interest to us, you are helping us shape where and when that coverage develops. - thank you!

 

OVO member but not got a smart meter yet? - Book today!

 

Interested but not yet an OVO member? - Check out our plans!

 

156 replies

Emmanuelle_OVO
Retired Moderator
Retired Moderator
February 2, 2023

Hey @dr_aureole,

 

Sorry for the issues you’re having, 

 

It’s a tough one, because if you go ahead with the installation we can’t guarantee the meter will be smart. 

 

Currently not many suppliers are offering smart 3 phase meters by default, OVO plan to do so in future. 

Renewable Energy? Big Fan.
Newcomer
February 2, 2023

Hey @Emmanuelle_OVO I have an existing 3 phase supply and non-smart 3phase meter with OVO; I was offered a place on the 3 phase smart meter pilot but I missed the first appointment and can’t rebook it is the issue.

 

Emmanuelle_OVO
Retired Moderator
Retired Moderator
February 2, 2023

Hey @dr_aureole,

 

I’m really sorry to hear that,

 

I’ll update this thread if we hear any more details about the availability of 3 phase smart meters. 

Renewable Energy? Big Fan.
Newcomer
March 5, 2023

Hi OVO I have a three phase domestic supply and desperately need a smart metre. OVO keep indicating on this forum that they provide three phase smart metre but that is absolutely not true from my experience , I have had four deprecate engineer appointmrr we nts each time they state they do not provide smart metres for three phase, please tell me I’m wiring and more so please provide a phone number for OVO that specify can deal with three phase smart metres 

Blastoise186
Super User
Super User
March 5, 2023

Good morning,

I can confirm that OVO is indeed starting to offer Three-Phase SMETS2 Smart Meters. However, the rollout is currently in a pilot phase and in very limited numbers. If you can’t get one right now, it’s probably because there’s no engineer in your area that can do them yet.

You can still get a Three-Phase Traditional Meter for now and then upgrade later. I’ll ask a Forum Moderator to note down your interest for now.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Newcomer
March 5, 2023

I’m not sure what you mean by a three phase traditional metre , I’m guessing I have one of those already with my three phase. My post code is M32 and I’ve met one of the senior OVO engineers in my area he called to my home for survey and confirmed he is qualified and trained to install three phase smart metre but OVO are not offering them and the trial has ceased can you shed more light on this ? 

Blastoise186
Super User
Super User
March 5, 2023

I get my information directly from two people I know at OVO that I talk to constantly. I’ve asked them for an update. I won’t be able to get a response until at least tomorrow morning however.

What I can tell you is that the testing phase has had different elements to it and it’s possible that the engineer you spoke to might have been on an earlier phase which isn’t currently active.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Newcomer
March 5, 2023

Thank you any further info you get re my specific area will be greatly appreciated Thank you I am a high user with my EV vehicle circa £450pm electric area is M32 Greater Manchester 

Tim_OVO
OVO Staff
OVO Forum Legend
March 6, 2023

Hi @Allan Downes and thanks for flagging this. 

 

As blastoise has called out, OVO are fitting polyphase meters on a small scale over the last few months. I’ve asked for an update in case the report of the engineer telling you we’re not doing these is correct. 

 

It is on a small scale though but I’m making a note of those that want it ASAP, so that when this trial expands more generally I’m able to let them know. I’ve added you to my list. 

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Newcomer
March 6, 2023

Hi we have installed EV supply to our property with the promise of a 10p tariff.

if I cannot get a 3 phase smart meter then presumably I am excluded from this tariff?