Updated on 29/10/25 by Ben_OVO
Engineer not turned up for your appointment? This topic might be helpful:
Sorry to hear that the engineer wasn’t able to complete your smart meter installation. It sounds like there’s an issue with your current set-up which needs to be resolved before we’re able to replace your meters.
It could be that your meter shares a fuse with a neighbour’s meter, which can happen if your meters are located in a shared meter cupboard or hallway. Read more about this and other issues which can prevent us replacing your meters on this guide.
To identify the exact issue in your case, we’d need to check the job report created by the engineer who visited your property. Reach out to our Support Team to check the next steps in getting the issue resolved.
Depending on the issue, you may have to contact your Distribution Network Operator (DNO) to carry out some work before rebooking your appointment. Our Support Team will be able to tell you if this is necessary.
Keep us updated as we’d love to hear the outcome of this one. Hoping it’s resolved quickly and you can enjoy the benefits of a smart meter soon! 