Hoping someone here can help because this has been an on-going battle since before OVO took over SSE and it’s gotten progressively worse recently. 

I live in a house that’s meters haven’t been checked, inspected, whatever since at least 1993.  I have two meters - one for my storage heaters and water tank, and one for standard electricity.  I’ve been trying to get this changed to either a smart meter if available OR just a standard single meter with a day or night rate. 

I have email chain(s) going on with SSE/OVO (One email chain is using @sseenergyservices.com and the other is @ovo.com hence posting here) that I seem to just be going around in circles.  I finally got through to the Electric Heating Team (EHT) about two weeks ago who changed me onto a single rate THTC tarrif, so both my standard and heating meters are at the same rate - but based on the readings that I’ve been providing, it’s still nearly 500 a month just for two storage heaters and a water tank.

Has anyone else had problems being switched to a single meter?  It’s driving me insane and I can’t change providers even if I wanted to because I’m currently bent over a barrel with an old meter system that they won’t change that no one else supports.

 

Edit: Just to add, it’s Radio Teleswitch Total Heat Total Control (THTC) to be specific.

Best answer by Emmanuelle_OVO

Updated on 16/05/25 by Emmanuelle_OVO:

 

Update on RTS shutdown:

 

As part of the RTS Project development, we are really happy to share with you our progress:

 

As you may be aware, the RTS signal that instructs some of our meters when to move to the “Off Peak Period”  will be closing down soon and we need to arrange for all of our RTS customers to have a meter exchange so they don’t lose any of their meter functionality.

 

The RTS signal will end for our customers on 30 June 2025. The period between 1 July - 30 September 2025 will then be used to close-down the RTS signal and allow us to manage any unexpected customers impacted.

 

After a very successful pilot, from the 17th June 2024 we will begin writing to our Economy 10 RTS customers to invite them to call us to arrange for their meter exchange. 

 

We are continuing to work at pace to enable the same solution for the majority of our other RTS customers and our aim is to begin writing to these customers in Aug 2024. 

 

We will continue to update you on our progress.

Hey @Noz1954,

 

I don’t know the exact figures, I’ll see if I can find out. I’d imagine a few thousand as Blastoise advised.

 

We’ve had a couple of customers on the Forum who’ve advised they have THTC set ups, would be interesting to get a conversation going. 

 

 

We’ve got an FAQ on exotic types which might have some useful information:

 

 

291 replies

Blastoise186
Super User
Super User
June 2, 2024

The latest data I have is that it’ll all be done by June 2025 at the very latest.

I’m scheduled to visit one of OVO’s offices again in the next couple of weeks. If the right people stop by, I MIGHT be able to find out more but I cannot promise that - this visit isn’t like my last one in November 2022 as it has a very narrow scoped purpose.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Chris_OVO
Community Manager
Community Manager
June 3, 2024

Hey @andykelp,

 

We’re still looking into resolving this as quickly as possible. There has been some industry challenges that have pushed the dates back as @Blastoise186 rightfully said till June 2025. Once more information is available we’ll be contacting affected customers to let them know next steps! 

Renewable energy jokes never get old.
Newcomer
June 5, 2024

So, are you saying that OVO wish to retain control over when storage heaters can and cannot charge as a means of managing the load on the system?

As Blastoise186 says its not OVO but SSEN, and other affected network operators thats the issue. 

Historically, HydroElectric and SSE, the previous retail suppliers in the North of Scotland, were also the network distributers until the retail and distribution sectors were split.  North of Scotland has very little access to alternative sources of heating, oil and gas for example, and many homes relied on electric heating. However, the distribution network could not meet the demand due to lack of capacity in the distribution system.  Rather than invest in upgrading the distribution system, the industry set up Load Managed Areas where electricity supply could be restricted to allow the distribution system to cope. 

 This is where tariffs like THTC came in (and others like it from SSEB and Scottish Power).  These tariffs enabled the electricity company to switch on and off the supply to premises in an area when demand exceeded capacity in the system but could not obviously suddenly shut off someones electricity. To overcome this they split supply between 2 meters - a “normal” meter for electricy used for lighting, cooking etc, and another meter for electric heating only. To do that however meant using a meter that could be switched on and off when the power company demanded it, hence the Dynamic Teleswitch Meter used in these tariffs.  There is a difference in some of these teleswitch meters - some are used “dynamically” when times can be varied and others are used in “dumb” mode i.e. times are set for example Economy 7.

The dynamic teleswitch meter meant that it could be switched on and off as required by using a signal from a BBC transmitter.  These signals from different suppliers were converted into codes by an industry operator and sent to the BBC for transmission. However the BBC have wanted to shut down the long wave signal transmitters for years as they use old valve technology and there are no spares!  The industry however, because they have not yet devised a system to replace it, have paid the BBC to try and nurse the transmitter into longer service and it seems that OVO are the biggest contibuters.  The latest effort is due to end in June 2025 after previous closure dates in 2021,2022,2023 and 2024 had to be extended. As you can see this issue has been known about for a long time, and OFGEM are now so concerned about the delay that they recently wrote to the industry to tell them to get “their finger out”

I can only speak of the THTC tariff as examples as I have been on this for 27 years as my house is all electric.  THTC allows, for storage heating, UP TO 12 hours supply in every 24 hours with a guaranteed supply of 5 hours depending on weather conditions e.g. heating times are longer during the winter months when it is colder. It allows the supply times to be varied throughout the day, depending on area demand, but most of the power is supplied at night with top ups during the day. Hot water is through 2 immerser heaters in the water tank - the bottom immersed controlled by the DTM but at differnt times to the storage heater supply, and the top immerser as a boost which can be switched on at any time but still charged at the “cheap” rate.  Electric panel radiators or electric fires (anything relating to heating your home apart from storage radiators) was also charged at the cheap rate at any time. You can see now why 2 consumer units were needed in a household - one for light and power and another for heating and hot water - as all the heating had to have separate controls.  Even the heating consumer unit had 3 separate supplies to it - one for storage only, one for 24 hour heating supply and the other for hot water.

That is the history of the dynamic teleswitch system, and it has been in use since the 1980’s, - it enabled suppliers to delay heavy investment in the distribution system and manage the load in their area. That has now came back to bite them in the bum - big time now that the radio signal needs to be switched off.

OFGEM says that smart meters have to be installed at no cost to the customer. It can be seen from the above history that putting a normal SMET2 meter in place with set switch off and on times would not solve the demand issue on the distribution system. It would also place the consumer with a cost to have their internal wiring re-arranged. To try and keep the original wiring, industry has been trying to come up with a 4 or 5 port meter  which would alleviate that problem but does not cover the load management issue.  DNO’s have been spending huge amounts of money over the last few years trying to upgrade the distribution system but that is still years away from being complete - if it ever will be.

Many consumers like the THTC tariff as it gives them the option of switching on their heating during the day at the cheap rate of the tariff. To others, THTC is now exorbitantly expensive as the cheap rate used to be 50% of the normal rate. Today that is not the case with the cheap rate being almost the same as the normal rate and these rates, because they are not “standard” tariffs, are not controlled as per OFGEMS price cap and suppliers seem to be able to charge what they like.  Many others look at “cheap” nightime rates from Octopus and others in single figure pence per kWh and wonder why they are being charged 22p per kWh for their cheap rate. Others cannot upgrade to green alternatives like PV because of the load managed are designation where they live. And so it goes on.

These DTM’s were brought in to save the  electricity industry money and were for their benefit, not the consumer’s. As Blastoise186 has stated earlier it is not a simple problem and it involves more than just OVO but the industry have known of the issue for many years.  It would appear to many that it is not a priority for them or they lack the expertise to come up with a solution (which I doubt).

Newcomer
June 5, 2024

Hey @andykelp,

 

We’re still looking into resolving this as quickly as possible. There has been some industry challenges that have pushed the dates back as @Blastoise186 rightfully said till June 2025. Once more information is available we’ll be contacting affected customers to let them know next steps! 

I’ve heard that excuse for more than the last 3 years. Time to knock heads together and lock them in a room until a solution is found.

Rank 6
June 5, 2024

The latest data I have is that it’ll all be done by June 2025 at the very latest.

I’m scheduled to visit one of OVO’s offices again in the next couple of weeks. If the right people stop by, I MIGHT be able to find out more but I cannot promise that - this visit isn’t like my last one in November 2022 as it has a very narrow scoped purpose.

What is it that'll be done by June 2025? Do you mean the rollout of the new kit will be completely installed by June 2025? I've also been told the rollout was due to commence June 2024.

Rank 6
June 5, 2024

It would be interesting to know what the transmission and distribution network issues that impact on THTC are. Could you please explain?

One of the Scottish issues is probably that currently the Shetland isles have a local diesel fuelled power station supplying elec to the islands population (23,000). No mains gas means mostly elec heating, to help the load demand on the local station a version of THTC was installed in many homes. A huge subsea cable is currently being commissioned to finally connect the islands to the national grid meaning the local power stn load management issues will no longer be an issue.

Newcomer
June 5, 2024

Hi All

Great explanation from metalsman - many thanks. External control of consumer goods feels a bit 1984 to me but then I suppose it was 1984 or thereabouts.

Anyhow, I contacted SSEN to see if they were placing restrictions on the THTC replacement from a network management perspective and they were adamant that they are not. One could argue “they would say that wouldn’t they” but I thought it was interesting. Moreover, I’m not aware that anyone is prevented from getting an EV in the region and installing a domestic charger running at 7kW when ever you like. If there really are network constraints how can this be?

Newcomer
June 5, 2024

Here’s an article that may be of interest if you haven’t seen it already.

John's switch from restricted to single meter wasn't easy | Home Energy Scotland

 

Newcomer
June 5, 2024

It would be interesting to know what the transmission and distribution network issues that impact on THTC are. Could you please explain?

One of the Scottish issues is probably that currently the Shetland isles have a local diesel fuelled power station supplying elec to the islands population (23,000). No mains gas means mostly elec heating, to help the load demand on the local station a version of THTC was installed in many homes. A huge subsea cable is currently being commissioned to finally connect the islands to the national grid meaning the local power stn load management issues will no longer be an issue.

Sorry but I cannot answer for situations outwith mainland Scotland as some islands will be supplied by an undersea cable and others by an on-island supply source eg, wind farm, diesel etc.

As to distribution networks, this is split into high voltage (generally the lines on pylon towers) and low voltage (33kV or less) In the UK, high-voltage network substations are used to step down the voltage levels from 275kV and 400kV to 132kV for distribution. Intermediate electrical substations then reduce the voltage further from 132kV to 33kV and 11kV for transmission to final distribution substations. Here, the voltage is reduced further to the 400V or 230V typically used commercially and domestically. Which part of the system has the issues is, as Blastoise186 said, a closely guarded secret and not something we will ever know the details of.

I am in NE Scotland, one of the areas with the highest concentration of onshore wind farms in the UK. Now maybe I am a cynic (in fact I know I am one) and I also ask myself why, if we have so many wind farms, we pay some of the highest transmission charges in the UK.  I even look out on windfarms but I do not get the benefit of all the power that is produced. AND I also pay for them being switched off when the wind is blowing (hundreds of millions of pounds per year) when the distribution system cannot cope with the energy produced.

If only the general public were made aware of and took an interest in all that is going on in the electricity supply chain there would be an outcry. All the public see from politicians is the smoke and mirrors of “the Green Transition”. I have been researching this since 2010 when the coalition government started tinkering with energy supply and ended up loading electricity bills with the majority (circa 90%) of the cost of the new social and environmental schemes they introduced and foisted onto suppliers (ECO, FIT etc) and then customers. Gas users typically only saw 10% of the cost of these schemes onto their tariffs. Emails to my local MP were flying off laptops and dont get me started on about Ed Davey MP (energy minister at the time)!

Time to get off my soapbox!

 

Rank 2
June 5, 2024

What really gets me wound up is that I know people in my area that are on Octopus Agile tarrifs. Literally the ONLY thing stopping me making use of cheap low demand times to charge storage heaters is the idiotic metering system. 

 

https://agile-octopus.datafury.io/#pricing-table

 

I plan on getting the heaters replaced with an ASHP and as soon as that is done I will be demanding this idiotic setup is ripped out and you won’t see me for dust as I will no longer have anything attached to the second meter. I expect OVO to make even this as difficult and painful as possible.