Removal of Dual meter

OVO have told me they can’t remove my dual meter. I moved in to a new property with 4 old storage heaters. The house EPC is rated an E. 

I can get a grant for an air source heat pump but the installers say that second meter must be removed. Storage heaters have not been used since I moved in and the meter obviously hasn’t either.

 as we get closer to Autumn I am keen to get a the new central heating system installed, however 2 long calls to OVO (on hold for most of it) and told they don’t have anyone available to do it. What can I do?

OVO said that the Air source heat pump will run of one meter which I am well aware of, that was not my question, it was getting the second redundant one removed.

BPLightlog
BPLightlogBest Answer
Super User
August 14, 2023

Your image shows 2 ‘budgie’ meters which have been wired to separately show the peak and off-peak usage. 
I would expect a new 5 terminal meter to be used to combine both of the connections and provide the same service. 
I don’t think that I have seen a set up like yours previously - perhaps that has confused things

Bring me Sunshine ~ E&E {Solar PV, Battery Storage, EV, ASHP and Home Assistant automation}

11 replies

Emmanuelle_OVO
Retired Moderator
Retired Moderator
August 21, 2023

Hey @jud Clark,

 

Thanks for bringing this interesting topic to the Forum!

 

With OVO you’d pay a standing charge per supply so if there are two MPAN numbers at the property, you’d pay two standing charges. 