Who owns what? - Your guide on cut outs, meters, fuses and who's responsible

  • July 10, 2020
  • 55 replies
  • 14660 views
Who owns what? - Your guide on cut outs, meters, fuses and who's responsible

Updated on 07/12/23 by Emmanuelle_OVO:

 

We’ve got an introductory guide to who to contact for each part of your meter and related equipment:
 

 
Need to book an appointment with OVO for a maintenance job or engineer appointment, check out this topic for job list and prices:
 


For a more technical breakdown check out the user guide made by one of our Community Members below 😊

 

.

The Meter Operation Code of Practice Agreement (MOCOPA) is between the UK’s Energy Suppliers and the Distribution Network Operators (DNOs).

The Agreement includes a document which classifies the way in which faults and non-compliances can be identified. It is well written, with numerous photographs.

It includes this excellent diagram, showing who is responsible for what in the area of your electricity meter:

The Agreement identifies faults with the Distribution Board (DB) equipment, which are the responsibility of the DNO. These are divided into three broad categories:

A: Emergency. A life threatening situation and requiring immediate action.

B: Remedial work required. Serious, requiring attention for safety reasons, but unlikely to cause a threat until it can be resolved.

C: Asset Condition; Requiring attention because it isn’t to the current standards.

 

Thus, by way of example, Code B11 Flow is a reporting category which prevents a Meter Installer from undertaking the work because there is a fuse on the Neutral supply as well as the Live.

 

Old Distribution Board equipment.

Sometimes there isn’t actually a fault, but your house appears to have old-style devices belonging to the DNO.

The Energy Networks Association publishes another guide with similar format, which enables such items to be identified. The Cut-out Types and Ratings Guidance  has full colour photographs and the date range when that equipment was fitted.

 

When viewing items of electrical equipment in your home, it is important not to tamper with it. If in doubt, take a photograph and post it here on the Forum for us to see.

55 replies

Transparent
Rank 20
Rank 20
July 17, 2020

Well I’m imagining that your fuses are sited within an old cast-iron box with an interlocked switch. If so, then there’s still value in uploading a photo of that enclosure on the back-board.

Then in months to come, if another end-user has a similar box, they’ll have an idea of whether it needs to be reported to their DNO for possible investigation and replacement.

Save energy... recycle electrons!
Newcomer
July 17, 2020

Ok, I'll see if I can get s good clear shot and upload it.

Newcomer
July 17, 2020

Here's a more complete shot of the board.

 

Transparent
Rank 20
Rank 20
July 17, 2020

That’s just what we need to see @killicrankie 

So that looks to me as if it’s a cast-metal box containing the cut-out fuses. That’s an asset failure with Category C06.

I’m not entirely sure of the earthing wires in the photo and whether your house has a PME supply (earth provided via the Neutral). But it’s possible there’s also a Category B10 fault present if the metal casing isn’t earthed!

As an aside, DNOs also think differently about what you fix to “their” back-board. You’ve actually got your PV isolator on the DB Board!

Having once had my knuckles rapped for fitting an extra 100A switch disconnector next to my meter, I now tend to keep all “my” hardware away from the board to which the DNO’s equipment is fixed.

In this case I think they’ll ignore it. There’s plenty of actual fault-codes to keep them entertained. :wink:

Save energy... recycle electrons!
Newcomer
July 18, 2020

Thanks for this @Transparent ! If categories were collectible it seems like I’d be close to the full set.

I do have a feeling that my sparky may well have mentioned earthing with regard to the incomer but couldn’t swear to it, and that this would normally be dealt with in the head replacement. In any case, he said the B11 was the most important issue to highlight and that it would get the issue dealt with promptly. Lol.

Tim_OVO
OVO Staff
OVO Forum Legend
July 19, 2020

Please keep us updated after we reach out to you and get things resolved. It would be great to hear from you about this, so there’s a conclusion to this topic. 

Carbon neutral - we need a community to get there! My green tech: Aclara SGM 1411-B smart meter, Chameleon IHD6
Newcomer
July 20, 2020

Hi @Tim_OVO ,  I didn’t get any call from you or Ovo generally as yet with any kind of solution. This leaves me with reporting this to the HSE tomorrow as previously advised.

Newcomer
July 21, 2020

Hi there,

I have just been canceled  by OVo the appointment with the engineer on 6th of August to upgrade my meter tails as I am looking to upgrade the main fuse from 60 to 100Amps with UK Power Network. 

Because of that I had to cancel their appointment too.

Very upsetting all this.

Anybody had recently any similar experience of upgrading meter tails with OVO or they are just pretending to do it but never actually getting it done?

Transparent
Rank 20
Rank 20
July 22, 2020

Hi @Adiavel - we’ve just started this Topic to discuss these issues.

There are several parties responsible for different parts of your electricity supply. Customers find it tricky to work out who needs to do what and in what order.

In your case OVO are correct. The Service Fuse upgrade comes first. As you say, it’s the responsibility of your Distribution System Operator, UK Power Networks.

It’s possible that the DNO will also change/upgrade the meter tails at the same time. That depends on their engineer’s assessment whilst he’s on site. These decisions are made primarily on safety grounds. Even if you posted a photo here, I doubt that Forum Members could adequately evaluate the construction of the tails and their condition without handling them.

Please post again if you’d like to make further comment. That’s what the Forum is for!

Save energy... recycle electrons!
Newcomer
July 22, 2020

Hi Transparent, thank you for your reply.

But I think you are very mistaken.

OVO MUST change the meter tails BEFORE the fuse is changed by UK Power Networks (DNO equivalent in my area). It is a common sense procedure. You can't let more power into the house by changing fuse when tails size might not cope with it. 

Also stating that DNO (or UK Power Networks in my case) might change the tails, it is again a HUGE untrue statement.

For DNO to change tails will need to break seals into the meter and the meter belongs to my Ovo energy supplier, so they will not do it.

Why are you providing false and misleading information?!

I was hoping on this forum I can find good answer.

My problem was related only to OVO handling very badly the meter tails upgrade appointment, blaming it on lack of engineers in my area. 

They booked me, they took my money  then a week later they cancelled my appointment.

Now they are playing the very hard to reach to try to book another appointment.

I just wanted to hear of similar experiences with other forum members.