Best answer by Abby_OVO

Updated on 07/10/24 by Shads_OVO

Hey @Hels24 

 

Welcome to the Forum

 

It can definitely be tricky getting your head around all things solar, but we’re all here to help make that a little easier if we can.

 

Having THTC does make this a little more challenging as some of the others have already mentioned, you can read more about it on this homepage too.

 

We’ve got a helpful topic on complex meter types such as Total Heat Total Control: 

 

As Blastoise186 mentioned, we’re currently working on a replacement for THTC meters and will update customers and any related pages when we have more.

 

I also wanted to link to some topics which share other users’ experiences of having solar panels fitted etc so you’ve got as much information before you make a decision:

 

 

I hope some of this has been helpful to you, but if you’ve got any other questions, just let us know.🙂

24 replies

Blastoise186
Super User
Super User
April 2, 2024

Welcome @Hels24 ,

I’m one of the Forum Volunteers here.

Right now might not be the best time to install solar panels if you’ve got THTC. With the RTS Shutdown round the corner and the need to get you upgraded to THTC capable Smart Meters being high priority, you may want to wait a bit longer and do the meter upgrade first.

I’ll ask @BPLightlog to stop by though - he might be able to advise a bit more than I can.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Hels24Author
Rank 1
April 2, 2024

I’m getting them through funding…and when I spoke to someone at OVO about the shutdown they had no idea when it was likely to happen because and what she said is they have literally nothing to replace them with at the moment…

Hels24Author
Rank 1
April 2, 2024

Thank you…I’m just so confused at the minute..

Blastoise186
Super User
Super User
April 2, 2024

An upgrade path for the meters is close to being ready. :)

Watch this space.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
BPLightlog
Super User
Super User
April 2, 2024

Hi @Hels24 , you should be able to have the solar PV system set up but it probably won’t be able to give you any export tariff (SEG).

You will need a separate monitor to look at solar feed but that is often provided as a link via the inverter. Failing that your installer could fit a generation meter but that is not really needed. 
 

Bring me Sunshine ~ E&E {Solar PV, Battery Storage, Hybrid EV, ASHP and Home Assistant automation}
Hels24Author
Rank 1
April 2, 2024

Ok…thank you for that…it’s tricky getting your head round it all :-)

Abby_OVO
Community Manager
Abby_OVOSolved
Community Manager
April 3, 2024

Updated on 07/10/24 by Shads_OVO

Hey @Hels24 

 

Welcome to the Forum

 

It can definitely be tricky getting your head around all things solar, but we’re all here to help make that a little easier if we can.

 

Having THTC does make this a little more challenging as some of the others have already mentioned, you can read more about it on this homepage too.

 

We’ve got a helpful topic on complex meter types such as Total Heat Total Control: 

 

As Blastoise186 mentioned, we’re currently working on a replacement for THTC meters and will update customers and any related pages when we have more.

 

I also wanted to link to some topics which share other users’ experiences of having solar panels fitted etc so you’ve got as much information before you make a decision:

 

 

I hope some of this has been helpful to you, but if you’ve got any other questions, just let us know.🙂

Currently Playing: She's Electric
BPLightlog
Super User
Super User
April 3, 2024

Just one thing to reiterate @Hels24 , with your meter set up it’s doubtful you would be able to get an export tariff despite some of the info above. You would still benefit from the solar feed during decent generating days of course and if these have some additional funding for you it’s probably still worth going for. 

Bring me Sunshine ~ E&E {Solar PV, Battery Storage, Hybrid EV, ASHP and Home Assistant automation}
Newcomer
April 22, 2024

We are in the same boat - funding for solar panels added to an existing THTC system. We’ve been advised that we can’t use the solar electricity generated ourselves and must export it all at 4p/kWh! Then we buy it back at 23p/kWh. Surely this can’t be right?

Can anyone confirm?

Blastoise186
Super User
Super User
April 22, 2024

You’d probably be able to use it yourself but I can’t be 100% certain.

However, if you are on THTC then it’s possible that constraints from the DNO may prevent you from having Solar Exports at all.

With that being said, some THTC Meters can’t cope with exports very well. Proceed with caution.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!