Updated on 12/06/25 by Emmanuelle_OVO:
ECAUL stands for "Control Auxiliary Load" and is a process used to configure the fifth terminal (also known as the auxiliary or control terminal) on a smart meter. This process allows you to set up an on/off schedule for this terminal, which can be used to control devices like electric heating.
Troubleshooting issues with a five port S2 meter
If your heating isn’t switching on as expected (or at the times expected) following a SMETS2 meter install, it might be due to an issue with this ECAUL configuration process, in which case we may be able to fix things remotely. Reach out to our Support Team to report these issues.
Hi @MarLab ,
Sounds like you may want to request the ECAUL/ALCS be reconfigured again - the settings may not have pulled down properly.
Other than that, did you have any other timers that might be interfering by any chance?