Can OVO fit a 3 phase meter which measures solar exports if we switch over?

  • May 16, 2020
  • 21 replies
  • 2156 views

Good morning

 

We currently have a 3 phase supply with a Landys Gyr meter 

 

We added solar a couple of months ago but have realised the meter isn’t billing us correctly for our net usage

 

Instead it bills us for import on any phase, even if we’re exporting on another phase.

 

weve been told by Ofgem tte meter needs to be compatible with “Vector sum metering” which our current model is not. 
 

Our current supplier (Bulb)  cannot supply the correct meter so have advised us to move. 
 

Before we change we’re looking for a supplier that will supply the correct meter. We’re aware smart meters aren’t yet available and we don’t want one anyway. But there are plenty of normal meters which perform this funxtionality

 

Can you let me know if Ovo can fit the correct meter if we move to you?

 

Thanns
 

 

Best answer by Nancy_OVO

Updated on 14/09/23 by Abby_OVO

 

Do OVO offer 3 phase smart meters?

 

3 phase (aka polyphase) installations in domestic properties are few and far between, so it's a minority of meter engineers across the country that have the skills required to complete these installations. There are also some technical challenges in making sure your job is allocated to an engineer with these skills but we are just as keen as you are to have Smart available for these sites ASAP, so if you would like to take part in this beta stage release, please consider the steps below:


From the start of May 2023, if you have a single rate 3 phase meter (i.e. not Economy 7 / 2-rate etc.) we would encourage you to book a smart meter appointment as normal online or over the phone on 0330 303 5063. (Please do not attempt to book sooner than May unless you have been contacted.)


This will then go through to a specialist team who will validate that it is single rate job and that an 3 phase engineer is available in your region. If this is the case, they will re-book your appointment with the right engineer. (So please bear in mind your appointment date/time will likely change, but we'll try to keep it the same where possible.)


Unfortunately, if you have a 2-rate meter or are not in an area covered by our current crop of 3 phase skilled engineers, you will need to continue with your heritage meter. We know this will be frustrating, so we are sorry about that, we are working to expand our coverage and by you flagging your interest to us, you are helping us shape where and when that coverage develops. - thank you!

 

Smart meters are able to measure export, for use in solar and other generation with the smart export guarantee 


If all 3 phases aren’t in use, you may consider downgrading to a single phase supply which is compatible with the current Smart meters we fit. Here's the process:

- Get an electrician to check if downgrading the supply is possible (you've done this already - nice work).
- Arrange a date for (and pay for) a visit from your Distribution Network Operator (DNO), who will rewire your supply to make it a single phase set up.
- Contact our Support Team to make sure we can get an engineer to you on the same day that the DNO visit, to fit your smart meter free of charge.

 

OVO member but not got a smart meter yet? - Book today!

 

Interested but not yet an OVO member? - Check out our plans!

 

21 replies

Blastoise186
Super User
Super User
April 5, 2022

No worries. :)

If you give UKPN either your MPAN or the current Meter Serial Number from the front of the meter, they’ll be able to locate the record for you. Technically speaking, even previous MSNs are also valid because they’re all linked to the same record.

I can’t do this myself as I only have permission to pull down my own records. But if you get stuck and need more advice, we’ll be here for you.