smart meter installation installed but not connected and daily standing charge
On July 14,2026, an OVO engineer came to house to do the smart meter installation. He did change my traditional electricity and gas “PAYG” meters to the new smart meters “PAYG”. But he could not connect the smart meters. He then left.
Since then my house has no electricity and gas up to now. I complain to OVO and tell her that the installation has not been completed and without any testing.
I topped up the electricity and gas on July 17,2026 via the OVO app and the daily standing charge has been levied since July 17,2026 even my smart meters has not been connected.
I make the complaint but the daily standing charge has not been stopped until my connection is done. I ask for a waiver of the charge so far OVO has made but positive response is received.
Margaret Chum