Been told that one of our meter as due to expire (out of calibration) and book this smart meter installation appointment. However when the engineer arrive on site we’ve been pointed out that the wiring were too old in the house and need to be replaced before installation. Alternatively she mentioned that we can get red link cut out installed by private electrician and then have the meter installed. So just wondering if that’s the case here? DNO fuse is not photoed as it’s in an awkward place. We’re looking to have the smart meter installed as we will need to add EV tariffs. Thanks