Trying to get mother-in-law's meter changed in anticipation of RTS switch-off.
It started off complicated and it just seems to get worse from there on!
Not sure where I am now.

Mother-in-law has an apartment in a Churchill older peoples' building (about 30 similar apartments).

Back in September 2024 I started with a phone call to book an appointment and was immediately hit with the question of tariff. I thought that I was just booking a meter change, not realising that I would have to pick an alternative to Superdeal. Anyway, after a bit of too-ing and fro-ing it seems that dumb night storage heaters will be best suited to Economy 10 and an appointment booked.

It seemed straight forward enough, so only mother-in-law was there on the day of the appointment. However, it turns out that the OVO technician could not do the job. Mother-in-law was told that there was asbestos and it required a different team and approval from the leaseholder (Churchill) to sort that out. The OVO technician gave mother-in-law a form for the leaseholder to authorise the work. Once OVO had received the completed form, then OVO specialist team would contact to make a new appointment. Unfortunately, I never saw the form, so I do not know what it was.

The form was sent through the leaseholder. In December 2024, When we hadn't heard anything from OVO I contacted them again and was told that these jobs were being coordinated and the team would get back in touch in late January.

Today, not having heard anything for a while, I thought I better get back to OVO again. Now I am told that I have to go to our DNO (SSEN), but I don't know why, I thought that this was OVO's job.  So, I am even more confused. This isn't what I originally understood and not sure what I am supposed to know about getting SSEN to remove OVO's meter and OVO to remove SSEN's fuse and who swaps the board? Am I missing something?

If it is any help.  The building was built and the meter cupboard installed in 1992 although the meter is dated 2001. The contents are simple; an incoming supply cable to a fuse, a tail-pair to an RTS meter and 2 tail-pairs out to 2 consumer units elsewhere (one for 24 hour circuits and one for off-peak heating circuits). Image attached.

 

 

40 replies

OVO Engineer
May 30, 2025

NADIS - No Asbestos Detected In Sample!!

@HairyMutley ill chase a planner to get you booked back in leave with me.

OVO Operations Excellence Manager and Former Field Operations Team Leader
HairyMutley
Rank 2
Rank 2
May 30, 2025

Thanks ​@Lukepeniket_OVO , brilliant result.

It is reassuring to have the worry about asbestos resolved.

Is there some sort of certification that can be put on the board itself and on the central records that will make sure this concern isn’t raised again in the future?

Chris_OVO
Community Manager
Community Manager
May 30, 2025

Amazing news ​@HairyMutley 😍

 

I love the sound of progress on a friday!

Renewable energy jokes never get old.
OVO Engineer
May 30, 2025

Markers have been removed from the account so it will be open for booking overnight, being a friday itll now be monday but ill chase it up

 

OVO Operations Excellence Manager and Former Field Operations Team Leader
Emmanuelle_OVO
Retired Moderator
Retired Moderator
June 2, 2025

You’re a superstar Luke! Keep us posted ​@HairyMutley 

Renewable Energy? Big Fan.
HairyMutley
Rank 2
Rank 2
June 2, 2025

The meter team have been in touch and booked an appointment to change the meter on Friday 11th July.

Thanks ​@Lukepeniket_OVO for getting the ball rolling again.

I will keep you posted on progress.

OVO Engineer
June 3, 2025

Ill be watching this one closely haha

OVO Operations Excellence Manager and Former Field Operations Team Leader
HairyMutley
Rank 2
Rank 2
July 14, 2025

Well, Wayne came on Friday and swapped the meter, so that is sorted 😁

Rather worryingly, the first question he asked was whether it had been tested for asbestos, He thought that I should have had a test certificate. He went away and contacted base for a test result, but was unable to get anything. I explained this forum discussion, after that, he went ahead with the work. From a health and safety perspective, I feel that he shouldn’t have to proceed on such poor evidence.  As I said earlier...

<snip>

Is there some sort of certification that can be put on the board itself and on the central records that will make sure this concern isn’t raised again in the future?

He also mentioned that without a test certificate; if any work was needed in the future (OVO or any other supplier), the whole testing thing would have to be done again.

Anyway, now just need to wait for the web app to catch up with the new configuration as that is still showing the old Superdeal three meter reading configuration; no smart readings shown as yet.

Abby_OVO
Community Manager
Community Manager
July 15, 2025

Hey ​@HairyMutley 

 

Glad to hear the engineer got that sorted in the end! It can take up to 6 weeks after installation for all of the data to settle in, so keep an eye on that in the meantime.

 

 

@Lukepeniket_OVO what do you think about the asbestos certificate and there being a record of previous testing in the event of future jobs? Is there something already in place or is it normal for a retest to have to take place each time? 

Currently Playing: She's Electric
Nukecad
Super User
Super User
July 15, 2025

You have to ask if retesting is going to be required every time someone needs to do work there then how often is that going to be?

I’m wondering if it might be better, and cheaper in the long run, to bite the bullet and get the board changed for a wooden/MDF one that is obviously not asbestos?

Personally I'd print off a sticky label saying simply:
"This board has been tested in 2005 when the meter
was exchanged and does not contain Asbestos"

and stick it on a corner of the board,
Any future engineer can then accept that label or not.

I said, Hey - Watts going on.