Refused a smart meter due to work at height?

  • January 23, 2025
  • 51 replies
  • 1339 views

Hi,

 

After the constant nagging from OVO to install smart meters, I finally gave in about a year ago. The installer came and refused to fit it, because they were unable to climb a ladder (the meter box is above the front door).

 

We share a common entrance wirth next door and their smart meter (fitted by Utility Warehouse) is next to ours in the same place.

 

I am now not able to request a SMART meter. We are looking to rent our property out soon so it would be very useful (I don’t think the tenants will want to climb a ladder to read the meter!)

The gas meter is outside the front door and easy to access.

Any suggestions for a way forward?

 

Best answer by Ben_OVO

Updated on 10/12/25 by Abby_OVO

 

Hi ​ 

 

Thanks for your post, and a warm welcome to the OVO Forum! 😁

 

If the meter is at height, then the advisor who books the job must clearly note this in the job booking. The reason you won’t be able to book an appointment at the moment is because of the previous aborted attempt.

 

My advice here is to contact our Support Team, as they will need to remove the appointment blocker so that this can be re-booked. When you do re-book the job make sure to tell the advisor that the meter is positioned at height, so that the engineer can bring the necessary kit. You’ll need to let them know exactly how high the meter is off the ground. Please note, if the meter is above six feet off the ground then we may not be able to do the job, in which case your District Network Operator will need to move the meter.

 

You can find some useful information on all of this in the previous topic below:

 

 

I hope this helps.

51 replies

Blastoise186
Super User
Super User
January 23, 2025

Hey ​@portland555 ,

Let me fling this backstage and get some thoughts.

Back soon!

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
January 23, 2025

Thanks ​@Blastoise186 . I recall at the time, they wanted us to a provide scaffold platform in the entrance hall which seems a bit over the top. If that is essential, why can’t Ovo just arrange it all for me?

Ben_OVO
Community Manager
Ben_OVOSolved
Community Manager
January 23, 2025

Updated on 10/12/25 by Abby_OVO

 

Hi ​ 

 

Thanks for your post, and a warm welcome to the OVO Forum! 😁

 

If the meter is at height, then the advisor who books the job must clearly note this in the job booking. The reason you won’t be able to book an appointment at the moment is because of the previous aborted attempt.

 

My advice here is to contact our Support Team, as they will need to remove the appointment blocker so that this can be re-booked. When you do re-book the job make sure to tell the advisor that the meter is positioned at height, so that the engineer can bring the necessary kit. You’ll need to let them know exactly how high the meter is off the ground. Please note, if the meter is above six feet off the ground then we may not be able to do the job, in which case your District Network Operator will need to move the meter.

 

You can find some useful information on all of this in the previous topic below:

 

 

I hope this helps.

Powered by the Sun
January 23, 2025

ok thank’s think I’ll leave it as is then! I don’t think it is possible to move the meter. Shame they saw fit to install it in such a silly location in 2007 when the property was fully refurbished!

Jeffus
Rank 20
Rank 20
January 24, 2025

@portland555 did ovo fit the smart meter?

Like you say some suppliers will install a meter over 6ft as your neighbour has found

There are loads of meters over front doors, there are streets all over the country where this is common. I seem to remember this question coming up before on the forum and one of the ovo engineers posted a comment about ovo being able to change them if they knew in advance. I may be mistaken as I haven't posted for some time. Perhaps one of the ovo engineers could post something?

The maximum height for a regular appointment seems to vary by supplier. For example this is EON Next. So you could always switch supplier even if temporarily to get the meter installed. Always best to let the supplier know obviously given your experience.

 

 

January 24, 2025

To be fair, ovo requested we provide a scaffold platform to do the job, but we saw that as unreasonable for us to arrange and pay for that. We have since had an electrician do a full consumer unit replacement on a step ladder with no issues.

 

Next door were with Utility Warehouse and I think they were reluctant to change their meter, but were persuaded into it somehow by the property owner!

 

I might try speaking to another supplier and offer to switch to them on the condition they install the meters.

Nukecad
Super User
Super User
January 24, 2025

A ‘one man band’, which many independent electricians are, can use their own discretion on whether working at height from a ladder is safe or not.

However a company has a duty of care to their employees, and so can sometimes tend to go over the top a bit where Health and Safety is concerned.

(That’s why your local decorator may happily paint upper storey window frames and gutters from a ladder, whereas a larger company will have scaffolding put up, for their employees safety).

If you do let the energy company know in advance that the meter is at a height then (if it’s not above their risk-assessed working height limit) they can ensure that the engineer has a stable work platform on his van to be able to access it safely.
But I don’t believe that they carry them routinely, they are usually not needed.
Something like this is often sufficient:
 

 

Suggesting that a customer has scaffolding put up (at their own expense) does seem a bit OTT, unless the meter is very high up any scaffolding would only need to be platform height anyway.

I said, Hey - Watts going on.
Bradley_OVO
Community Manager
Community Leader
January 24, 2025

@portland555 Just going to query this further for you as it doesnt feel necessarily right that this cannot be done for you. On this point, I want to lean towards ​@Jeffus and say it’s something we dig into a little further!

 

Off the back of ​@Ben_OVO’s comment - it’s likely that we’ll just have to make the meter exchange appointment set up clear so an engineer knows what to expect when attending the property.

 

But, for clarity I’m just going to chase this up with one of our experts who works out in the field - Once I hear back, I’ll let you know!

I'm not lazy, I'm just in energy saving mode!
January 24, 2025

Thanks ​@Bradley_OVO . I chatted with Eon Energy online - they said I would have to switch to them first before they could check if they could fit a meter.

Any resolution would be good - I don’t even mind paying £50 or so for the installer to rent the platform, but I’m not going to ring up a building supplier or whoever and arrange it all myself as I don’t have the necessary knowledge (or the time).

We are looking to rent the property out in the future, and I don’t really want tenants to be climbing ladders to take meter readings!

Blastoise186
Super User
Super User
January 24, 2025

Hehehe, that’s where our magic tricks come in. We’ve been talking about this between ourselves backstage… And we know exactly who we’re going to ask for expert advice.

We’ll keep you posted!