I finally got my smart meter on 11th July this year - PAYG for THTC - and all seems well.

Until I got an email from OVO saying they have to upgrade this meter before 31st Dec for it to keep working. 

Unfortunately, your current smart meter model is now being removed from the wider smart network on 31 December 2025. For your meter to keep its smart features, we need to upgrade it before then.

 

Is this normal? Why would they install a meter with less than 6 months working life left? Do they mean a software upgrade or is it a whole new meter? It is an engineer visit, that I do know, but trying to book anything online when you have a PAYG meter is an exercise in frustration

Best answer by Abby_OVO

Hey ​@MagsMcLean 

 

Glad to see LukePeniket has already stopped by, as mentioned we’ve been working on upgrading some of our customers’ meters with 4G compatible communication hubs during the radio teleswitch shutdown.

 

However, due to an issue with the wide area network (WAN) connectivity in some areas related to the comms hubs installed at this time - we had to stop installing these specific comms hub models in July 2025 - and further to that, the comms hubs that they have installed will be disconnected from the smart network Wednesday 31 December. This decision was made externally, and not by OVO, but we will be the ones supporting you, our customers, thought this time.

 

With yours being a recent PAYG exchange in relation to the RTS shutdown it does sound like this email is correct and you’re one of the one’s who need to have an exchange as Luke mentioned.

 

We’re really sorry for any inconvenience or confusion caused, but I do hope we’ve been able to clear this up a little for you.

18 replies

Blastoise186
Super User
Super User
November 17, 2025

Hi ​@MagsMcLean ,

That’s… Really weird…

Could you show us the meter please? That’ll help us give you better advice.

Thanks

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Rank 1
November 17, 2025
I know none of the lights are on, but it is working….honestly!

 

Blastoise186
Super User
Super User
November 17, 2025

Hmm…

Lemme grab a ​@Lukepeniket_OVO for this. :)

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
OVO Engineer
November 17, 2025

hey, essentially yes we do need to come out and exchange the comms hub =] please book in =]

 

long story short is we installed 2g/3g hubs to overcome the RTS problem but its now created a new problem which will be sorted by installing a 4g hub. worth noting that it only affects smart communications come 31/12 if not swapped

OVO Operations Excellence Manager and Former Field Operations Team Leader
Abby_OVO
Community Manager
Abby_OVOSolved
Community Manager
November 17, 2025

Hey ​@MagsMcLean 

 

Glad to see LukePeniket has already stopped by, as mentioned we’ve been working on upgrading some of our customers’ meters with 4G compatible communication hubs during the radio teleswitch shutdown.

 

However, due to an issue with the wide area network (WAN) connectivity in some areas related to the comms hubs installed at this time - we had to stop installing these specific comms hub models in July 2025 - and further to that, the comms hubs that they have installed will be disconnected from the smart network Wednesday 31 December. This decision was made externally, and not by OVO, but we will be the ones supporting you, our customers, thought this time.

 

With yours being a recent PAYG exchange in relation to the RTS shutdown it does sound like this email is correct and you’re one of the one’s who need to have an exchange as Luke mentioned.

 

We’re really sorry for any inconvenience or confusion caused, but I do hope we’ve been able to clear this up a little for you.

Currently Playing: She's Electric
Rank 1
November 18, 2025

Thank you all for your responses. I very much appreciate the explanation.

So I called the number on the email, who passed me over to PAYG, who said the Smart Meter Install team will call me back (I think that’s what he called them).

Why not just give me the direct line to the correct department? I explained the whole 2/3G to 4G upgrade to both of them and they both went ‘oh yes, know what you’re talking about, I’ll pass you on’.

Now I’m going to have to answer every spam call that comes in until the team calls me back

Johnny Thunders
Rank 3
Rank 3
November 19, 2025

@Lukepeniket_OVO is this a small issue in isolated areas? Mainly relating to the RTS issue? 

Seems like something that needs fixing/changing before December 31 - this is the first post I've seen mentioning it. Has everyone potentially affected been sent letters by OVO? 40ish days left given work diaries... Well, doesn't bode well. Especially as communication is one of the selling points for smart meters. If it is going to affect many, many hubs installed over a certain period of time and geographical location - then will OVO be prioritising and fixing ASAP?

Just curious as the OP mentioned it and I'd not seen anyone mention similar. 

Would be nice if there was (is there?) a way to discern whether a hub is using 2/3 or 4G by looking at it.

Any information appreciated ✌️

Blastoise186
Super User
Super User
November 19, 2025

Howdy ​@Johnny Thunders ,

From what I’ve seen, the Forum Moderators are working on some content for this at the moment - we should have it live soon.

HOWEVER… I can tell you instantly whether you’ve got a 2G/3G Hub or a 4G one if you’d like? If you’d like me to do this, please provide us with a photo of your existing setup and we can check it for ya.

Thanks!

(Oh and this was also my 9000th comment!)

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Firedog
Super User
Super User
November 19, 2025

… is this a small issue in isolated areas? Mainly relating to the RTS issue? 
  

I know you asked Luke, but I’d just point out that this thread is specifically about cellular communications hubs (CH) installed in a few cases in Northern Scotland when RTS meters controlling THTC tariffs were exchanged for SMETS2 smart meters. Authority for these installations was first given in the spring of 2025. It will only have been customers in locations where the Arqiva long-wave radio signal was inadequate who had this type of CH fitted. So the answer to your question is probably Yes.  

  

If it is going to affect many, many hubs installed over a certain period of time and geographical location - then will OVO be prioritising and fixing ASAP?
  

I can imagine that there are in fact not very many cases. Are you in Northern Scotland, recently migrated from RTS with THTC to a smart meter, and with a cellular CH installed between March and July 2025? 

It’s possible that this type of CH was also fitted during that period when the meter exchange wasn’t triggered by the RTS switch-off, e.g. simply replacing a faulty or obsolete meter. 

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |
Johnny Thunders
Rank 3
Rank 3
November 19, 2025

Um, thanks ​@Firedog for the input.

Us awful lay people didn't realise the nuance of the acronym 'THTC' equating to a post described as expressly: "specifically about cellular communications hubs (CH) installed in a few cases in Northern Scotland when RTS meters controlling THTC tariffs were exchanged for SMETS2 smart meters."

Obviously, in a discussion forum where the OP wasn't denoted as such a niche topic, us terrible randoms will pop up with questions. Won't be doing that again.

✌️