Meter tails too short, who should pay

Ovo came to install a new smart meter, as the meter tails were too short they did not want to do the job, eventually after much discussion with Customer Care they want to charge me about £200 to install longer ones. I do not want or need this change other than to install their smart meter.

I think this is not my cost to bare, the distance between cut off and existing legacy smart meter is about an inch…

 

 

 

19 replies

Blastoise186
Super User
Super User
Nov 18, 2026 2:12 PM UTC

Howdy ​@gduk !

Shared Responsibility I’m afraid! The tails from the main fuse/service fuse from the street to the meter are for OVO to cover and pay for, but the tails from meter to consumer unit are for you to cover and pay for.

1 Inch is 2.5cm short which is unfortunately too big a gap to do the install safely. I’ll see if ​@Lukepeniket_OVO has any thoughts, but I suspect it’s a shared responsibility case.

This will probably need lengthening anyway to allow enough space for a meter to fix regardless - there’s not enough space to fit a new meter in the exact spot the current one is in - but that lovely space to the right is ideal and can fit lots of kit easily.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
gdukAuthor
Rank 2
Nov 18, 2026 2:34 PM UTC

The thing is they need to move the existing meter before I can lengthen the tails to the consumer unit, so for sure they need to go first. Otherwise I can just not have a working smart meter I suppose.

 

What is more worrying is Customer Care told me that I should get my sparky to move the meter

gdukAuthor
Rank 2
Nov 18, 2026 2:46 PM UTC

I meant to add that Ovo wanted me to pay for them to extend their tales, not mine.

Blastoise186
Super User
Super User
Nov 18, 2026 3:31 PM UTC

It’s ultimately one job. You’re looking at a Meter Reposition anyway, which is £166 for Single-Phase per 

Only OVO can do that job - your sparky cannot and should refuse it.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
gdukAuthor
Rank 2
Nov 18, 2026 4:00 PM UTC

That does not make sense, new meter is bigger so they need to reposition it. If they want me to use a new smart meter then they need to do what is necessary. I am fine to continue to submit manually meanwhile. It seems a bit much to expect that the new meter would fit in the space of the old one anyhow.

 

The engineers initial advice was for us to move the meter as mentioned above, then had a whole thing with customer care who said that Ovo does not touch tails, which is obviously not true. So if installing a new meter requires lengthening of tails you would think that is their remit to undertake.

 

Anyhow thanks for commenting

Nukecad
Super User
Super User
Nov 18, 2026 5:17 PM UTC

We need to ask who was it that asked for the meter to be replaced.

Did you request that the meter be changed to a smart meter?

Or was it OVO said that the meter has to be replaced because it is out of certification? (I can't see the meter date on that photo).

It does make a difference.

In the first case you have requested the meter swap before it is needed by law - meaning that is non-essential work - and so the repositioning / longer tails needed  will be at your cost. (or at shared cost if agreed).

However in the second case then as the swap is needed by law because the current meter is out of certification then it is essential work and OVO should do the required work at no cost* to ensure that you have a certified meter.

*It doesn't look to be the case here  because it looks like a SM will fit in that cupboard, but I think that they can still charge if meter relocations of further than 1 metre are needed. (That's basically classed as a new supply and the DNO has to be involved).

Out of beer error >>>> Recovering memory.
gdukAuthor
Rank 2
Nov 18, 2026 5:48 PM UTC

No idea of its out of certification, how can I tell?

Better image below 

 

gdukAuthor
Rank 2
Nov 18, 2026 5:55 PM UTC

Google says i got 2 years left, I think we're splitting hairs at this point then. As previously mentioned they need to extend the tails to put a new one anyhow.  Thanks for taking the time to educate on this

Blastoise186
Super User
Super User
Nov 18, 2026 8:37 PM UTC

Actually… You’ve only got one year left. That’s a legacy L+G 5235A from the Ampy → L+G era right before they got absorbed into L+G E110. You only have until the end of 2027 as guaranteed in-test status. The M08 gives it away - certified in 2008.

Throughout 2027, I suspect OVO may start nudging you to upgrade so it’s probably worth doing now to avoid the nags.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Nukecad
Super User
Super User
Nov 19, 2026 10:57 AM UTC

You didn’t say whether it was yourself that requested the meter swap, but from you latest replies I go get the impression that on this occasion it was your request.
Which technically makes it non-essential work, and so charges can apply if the meter has to be relocated and the tails extended.
From the non-essential works list as linked above a meter reposition cost is £192.
(If it was just a straight in-place swap then they’d usually do it FOC).

Personally I would wait until OVO start nagging you to have it replaced, at which time it becomes deemed essential work and should all be done FOC.
(unless as said before a move of more that a metre is needed).

Just for information here is the User Manual for your current meter, which states a 20 Year Certification Life.

https://www.solartradesales.co.uk/Cache/Downloads/L-and-G-5235-User-ManualBrochure-info.pdf

As Blastoise186 has already mentioned yours was certified in 2008, and so is due to be replaced before the end of 2007.

Note that the meter pictured in that Manual is an Ampy brand whereas yours is a Landis+Gyr, so this may (or may not) be of interest:

 

Out of beer error >>>> Recovering memory.
gdukAuthor
Rank 2
Nov 19, 2026 11:04 AM UTC

I really appreciate all this detail, it was my request but that is because they offered me on my account to upgrade to a smart meter. When complaints contacted us earlier today we did mention about the meter expiry, not sure if that was a factor but they are now going to come and replace the meter and extend the tails in a single visit, no charge to us. 

All I can say is that when the meter was installed 20 years ago, what were they thinking with those tails….

Blastoise186
Super User
Super User
Nov 19, 2026 12:04 PM UTC

I know right! Trust me, we hardly ever see such… Stumpy… Meter Tails on here. It’s so rare that I think we’ve only seen it like, two or three times ever? I say that knowing that some OVO Engineer is gonna see this and yell through the screen they’ve seen more than that - we know you lot read these threads! If you are an OVO Engineer and have evidence of that, my DMs are open lol. :P

But yeah, that’s kinda why I can’ be absolutely 100% on this one - it’s a rare situation that OVO hasn’t really told us much about how it gets handled because you don’t usually see meter tails so short that there’s basically no meter tail at all. We’ll keep digging though!

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Nukecad
Super User
Super User
Nov 19, 2026 12:41 PM UTC

Great to hear that they have now agreed to do the required work without charge to you.

 

…. it was my request but that is because they offered me on my account to upgrade to a smart meter.

Possibly a bit of a edge case there then.
As the meter still has over a year left on it’s certification then it’s not really essential work yet, but when making the early offer they wouldn’t have known that the meter would need to be repositioned.

I’d say that common sense has prevailed, they would have had to do the work FOC anyway next year, so they might as well do it FOC now and get it out of the way.

Just a couple of things I noticed looking at your earlier image that may need resolving before a smart meter can be fitted.
Where the Blue X is looks like plenty of space for the new meter - but is that bare wall?
And what are those two cut wires near the bottom?
 

If it is bare wall then it will need to have a backboard fitted to fix the new meter to. That should be done before the engineer turns up to fit the new meter.
That board is your responsibility and cost to have done.
Backboards are readily available and any electrician can fit one.
It looks like you have about 150mm x 250mm space there (but check it) so you’d probably need to get a bigger board and trim it down to fit.
eg. This one might only need 50mm or so trimming from a long side, and 2 new holes drilling: https://www.amazon.co.uk/TEW-Retardant-Consumer-Meter-Spacers/dp/B0CRHXN89J

If it’s cut down like that to make a separate piece to fix to the wall without disturbing the existing board then you could DIY or preferably get a local electrician in. (They can also check those two cut wires while there).
You can’t touch/replace the board that already has equipment mounted to it, only you supplier and DNO are allowed to touch their own equipment.

As for the two cut wires I would expect that anyone working in that cupboard would want to know what they are and that they are not live before starting work.

Out of beer error >>>> Recovering memory.
gdukAuthor
Rank 2
Nov 19, 2026 1:13 PM UTC

Ah again some invaluable information, much appreciated, I’ll install the backboard. How much space would the new meter need, I built the cupboard so if need be i guess I can build a new one. The wires were for an antenna so they are coax, long since redundant now with apps for live TV.

The engineer that came to fit the new meter mentioned none of the things you highlighted, I think he took one look at those biscuit tins and the short tails and ran a mile. This time they said they will send someone properly qualified to install new tails and meter same time

Firedog
Super User
Super User
Nov 19, 2026 4:56 PM UTC

Just to add to ​@Nukecad’s reply, don’t forget the origin of this problem - the meter tails. Nowadays, they’re big barely bendable brutes - especially at this time of year - about 1/2” thick, so there has to be space for a minimum bending radius of say 2”. This means the new meter will have to be at the right-hand edge of the new backboard and ~3” from the bottom of the box (12·5, 50 and 75 mm respectively!).

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |