I moved to OVO on the 17th April. I was previously with British Gas and I have a SMETS1 Smart Meter. How long do I need to wait until I can get a SMETS2 meter installed?
Answer
I have a first generation smart meter can I get an upgrade?
Best answer by Blastoise186
Updated on 20/10/25 by Abby_OVO
Â
Ok. If your current meter works fine with OVO, you won’t be eligible to have it replaced because you won’t need it to be replaced.
Â
As Blastoise186 has mentioned, if you’ve already got a working smart meter, no matter what generation model it is, we won’t replace that meter unless it becomes faulty or out life span.
Â
If you think there’s a problem with your smart meter, check out the smart meter health checks below and complete the necessary check for your meter:
Â
Log in to the OVO Forum
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.