Email saying Aclara SMETS2 will stop working properly on 1st June 2026 and needs replacing?

  • January 13, 2026
  • 30 replies
  • 761 views

Does anyone know why my Aclara SMETS2 will stop working properly on 1st June 2026 and needs replacing?  It’s new and was only installed in April 2025.

 

Best answer by Firedog

Does anyone know why my Aclara SMETS2 will stop working properly on 1st June 2026 and needs replacing?  It’s new and was only installed in April 2025.
 

Referring to your earlier thread about your new meter, I see that it was fitted with an SKU1 cellular communications hub (CH) instead of the more normal long-range radio hub. The smart network owner (DCC) have decreed that all of these stop-gap SKU1 CHs shall be exchanged for 4G hubs. The deadline was 31 December 2025, but that seems to have slipped a bit. So it’s probably just the CH that has to be exchanged. It’s a quick and easy procedure (known as TCSO), which doesn’t even need the power to be cut off. 

30 replies

Buzby
Rank 6
Rank 6
April 30, 2026

That could be it. The top half of the meter looks like it is a seperate module, with it’s own security tag. It’s labeled ‘SKU1 Cellular’ and ‘UBC-TN6’. I can’t tell if it’s 3G or 4G.

Whatever, I expect problems no matter how straightforward the process should be. No interaction I’ve ever had with OVO has gone smoothly.

 

 

I burn gas, petrol, and diesel. I am 100% Carbon Neutral ( Well, I will be, when I can buy some carbon offsets.. )
Blastoise186
Super User
Super User
April 30, 2026

That’s the 2G/3G version. I checked with an engineer friend of mine - the 4G versions have a different designation.

It really is a simple swap via Trust Centre Swap Out - power stays on, the engineer just presses a few buttons and bloop!. Done.

If it FAILS for any reason, the entire setup gets swapped out.

Securing energy by zapping security bugs... For that is The Blastoise Way! Remember, I'm just like you - AI Powered Evil Geniuses aren't Staff!
Buzby
Rank 6
Rank 6
April 30, 2026

I’ve had a few emails saying meter upgrade is booked for 18th May. However, I recently had a physical letter asking me to make an appointment. Suspecting OVO have got something mixed up, I just now phoned to confirm 18th.

When I phoned, the agent told me I had booked for 18th May, but that I had then cancelled it !

I did not book any date, the 18th was suggested by OVO.  No way have I canceled, and I told the agent so. She quickly backtracked and said it must have been a glitch of some kind.

So my meter upgrade is now re-booked for 18th May, hopefully. 

I burn gas, petrol, and diesel. I am 100% Carbon Neutral ( Well, I will be, when I can buy some carbon offsets.. )
Ben_OVO
Community Manager
Community Manager
April 30, 2026

@Buzby it should be a very smooth process, and it’s part of the Industry-wide switch over to 4g comms hubs. I’ve taken the info below from our website page here.

 

Some smart meters currently rely on 2G or 3G mobile networks, but these networks are being phased out across the UK in the coming years. These are being replaced by a 4G network, and once this happens, will not function properly if they are not upgraded.

 

Here’s what this means for you:

 

  • SMETS1 meters: These will need to be replaced with SMETS2 models.

  • Some SMETS2 meters: These may just require an upgrade to a 4G-compatible communications hub.

 

If your meter isn’t replaced or upgraded you’ll still receive your energy supply as usual. However, you’ll need to manually submit meter readings to make sure your bills are accurate. If you pay for your energy by topping up, you’ll have to manually enter a 20-digit code into your meter when you top up online, at PayPoint or Payzone shops, or over the phone.  

 

The network switch-off will happen gradually over the next few years, region by region. We’ll contact you when it’s time to arrange an appointment for your upgrade.

Powered by the Sun
Firedog
Super User
Super User
April 30, 2026

Thanks for that overview, ​@Ben_OVO.

What it doesn’t mention, though, is that 3G service in the Northern region (i.e. anywhere in GB north of Manchester) is being retired. CHs up there are supposed to run on Long Range Radio (LRR), not cellular networks. There were many customers up there who had relied on the LW RTS signal, but that is also going finally over the next few weeks. Most RTS systems have now been replaced by smart meters, but some of them refused to connect to the LRR WAN. As a stopgap, they were fitted with CHs like the one ​@Buzby has; these now have to be exchanged for 4G ones before the 3G service is cut off on 1 June. 

Everyone else - i.e. those in the Central and Southern regions will have their 3G CHs swapped out between now and 2033, when 2G/3G is due to be finally retired.

This is DCC’s headache; OVO is just the minion doing the work!

 

[EDIT a bit later] I did a quick search to find any documentation about this urgent process, but I’m afraid I failed. There have been a couple of threads about it here, and some OVO metering expert chipped in to give the explanation I hope I’ve reproduced faithfully. You might test the forum’s site search to its limits to find the references ...] 

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |
Peter E
Super User
Super User
April 30, 2026

@Firedog you've done a good job there as that was from your memory. This issue has been spread over a number of threads so it's not easy to gather them together in one place. 3G has gone from a lot of areas now but the meters can use the Short Message Service SMS on 2G as it's only a small amount of data that needs to be sent. 2G will be phased out from 2031 so upgrades need to start now for 4G though that has been around for 15 years and its phase out begins in 2030 😱 (Noooooooooo)

 

Peter

Reducing my yearly fossil fuel usage with an EV (-900 litres petrol), A2AHP (-8,700 kWh gas) and Timed Immersion heater (-1,500 kWh gas)
Ben_OVO
Community Manager
Community Manager
May 1, 2026

Thanks for the extra details ​@Firedog 😊.

 

@Buzby apologies for the confusion when you spoke to the advisor. If the advisor was new to the company they may well not have known about the changeover to 4g, and may have just thought it was a normal appointment booking.

Powered by the Sun
Firedog
Super User
Super User
May 16, 2026

​3G has gone from a lot of areas now but the meters can use the Short Message Service SMS on 2G as it's only a small amount of data that needs to be sent.
  ​​​​​

 

Only if DCC continue to pay the bill for the Northern CSP region, which they won’t from 1 June onwards. I think the 4G service is being provided by Vodafone.

Noel | I have no official status; I'm just a volunteer who comes here to help other customers. My gear: Aclara SGM 1416-B Electricity-only E7 meter; Chameleon IHD3-PPMID-AAA | It may look as if I know what I’m talking about, but don’t let that fool you. |
Buzby
Rank 6
Rank 6
May 18, 2026

New Comms Hub, Toshiba 4G DBCH,  fitted to my meter today about 12 hours ago.

How long should it take for IHD to re-connect ? 

I burn gas, petrol, and diesel. I am 100% Carbon Neutral ( Well, I will be, when I can buy some carbon offsets.. )
Blastoise186
Super User
Super User
May 18, 2026

Usually pretty fast! If it was done via Trust Centre Swap Out (which it should be!) then it’s as fast as the meters reconnect.

Keep an eye on it for a few days just to be safe.