Skip to main content
Rank 2
June 16, 2023
Solved

Can Energy Suppliers manipulate smart meter reading remotely?

  • June 16, 2023
  • 33 replies
  • 13215 views

I’ve heard that energy suppliers can remotely control smart meters in order to even cut off the energy supply to a certain property. It made me wonder if they can remotely override the meter reading by adding extra units on top of the actual usage regularly. If they have remote control access to it, when/if a customer complains regarding an abnormal increase, they can even remotely adjust it so that the meter would not be seen as faulty during any inspection.

 

Is there a guarantee or a way to validate that this would never happen to smart meter users? 

Best answer by Blastoise186

Updated on 17/04/26 by Abby_OVO

 

Hi,

Firstly, the ability to remotely disconnect is heavily locked down and comes under the exact same rules as getting a warrant to force disconnection i.e. it is an absolute last resort.

 

As for meter readings, no these cannot be remotely adjusted or changed under any circumstances. Firstly, there’s not even a SMETS Command for it and no SMETS Command means it can’t be done. Secondly, doing such a thing would be highly illegal and Ofgem would probably catch on rapidly. And thirdly, security measures on the meters themselves makes pulling off such a stunt almost impossible anyway.

 

Likewise, there is no option to modify, change or adjust the reading locally either. The only way the reading can change is when it is measuring energy in the course of normal usage or while being tested. If memory serves, the ONLY way to modify a reading on a Smart Meter is to return the entire unit back to the manufacturer and have the manufacturer do it. However, by that stage chances are the meter won’t be put back into service in the field anyway.

 

I know what those measures are, but it’s a bit of a secret so I can’t discuss it here as I don’t want to give away any clues that could enable tampering (nor do I want the liability risks either).

 

Information on smart meter data security can be found at this link. We also have a helpful topic on the Forum which might be of interest here:

 

33 replies

Nukecad
Super User
Super User
November 6, 2025

The reply you got was incorrect.

There is no ”automatically resets for the next month” whoever said that doesn't understand properly how smart meters work.

Remember that people answering the phone to customers don't usually need training in technical stuff, only with billing/account stuff.

Generally the meter itself stores 13 months worth of readings and then the oldest stored days reading drops out as each new days usage is recorded.

I said, Hey - Watts going on.
Ben_OVO
Community Manager
Community Manager
November 7, 2025

@HKT888 thanks for your post.

 

I’m wondering whether the readings coming through to them were from a different register on the meter, eg you were looking at the readings for ‘rate 1’ on the meter, but the company you’re with were receiving reads from the ‘total’ register. Very difficult to know what’s happened here. Please keep us updated as to how this complaint pans out.

Powered by the Sun
Rocksteady
Rank 2
Rank 2
November 19, 2025

Hi HKT888,

When I read your post it raised my suspicions that your meter is a Maximum Demand meter that is usually for businesses running machinery of reasonable size. The give away is the HH bit, which means that it reads every half hour’s maximum draw. So your highest draw in any particular half hour will dictate what your final month end bill will be. The older electromechanical versions of these meters had a needle on a dial that was driven up by the meter each half hour, then the meter would drop back to it’s zero each half hour leaving the needle where it was. So if the needle went say half way up its scale in one half hour, but only a quarter for the rest of the month, your bill would be based on that highest half hour pull.

 

When these meters are used in industry, I have always encouraged my industrial customers to start their big motors in stages rather than all together. That helps because when the biggest motor is up to speed and fully online, it then helps the others to get going by it’s regenerative effect. Also I encouraged them to start the first batch of motors 5 mins before the hour or half hour, then the rest 5 mins after.

 

If you aren’t running any biggish motors for production, I wonder why you have a Half Hour meter installed? You know what you are running better than I but I hope this info helps in some way.

Don't throw it away, save it for RON.