Skip to main content
Rank 7
May 23, 2025
Solved

OVO refuse to install EV charger

  • May 23, 2025
  • 14 replies
  • 270 views

OVO having installed a Givenergy AIO battery Gateway and PV panels about 6 months ago, I now intend adding an EV charger. 

The EV installation team now insist that additional groundworks are completed involving drilling through a 3m thick granite and concrete wall.

The solar and battery installation (using a 5m long catenary) was signed off by OVO engineers as the only reasonable method of connecting a detached garage to the meter box without drilling through the aforementioned granite wall. The panels and AIO are up and running and working fine and appear safe as the catenary is 4m above ground. 

Has anyone else faced this situation as the intention was always to add an EV charger at a later date?

Failing that, does anyone know a reputable installer in the SW area (Plymouth)?

 

Best answer by mikes01666

Updated on 27/01/26 by Chris_OVO

 

Got an update from OVO.

They state that the risk assessment for solar install (working at height predominantly) differs from that of an EV charger install (predominantly working on the ground).

Thus an EV charger install on a catenary 4m above ground would involve a more involved risk assessment that the charger installer can't do. 

They have still declined to install. 

I suppose at one level it makes sense but doesn't help in the installation of the EV charger. 

I plan to contact Hypervolt directly to get the charger installed. 

As it involves a single cable run and the connection of two terminals at the Gateway  I wonder if using for a local electrician to install might be the best route. Any opinions? 

Thanks for all your advice. 

 

14 replies

Chris_OVO
Community Manager
Community Manager
May 29, 2025

Thanks for the update ​@mikes01666

 

It's unfortunate we can't perform the installation ourselves, but as you mentioned, it's understandable. There are likely various insurance and liability regulations they must follow. Hopefully, Hypervolt can provide a solution or at least guide you appropriately. If you encounter any difficulties, please don't hesitate to reach out again, and we can offer advice on alternative installers if needed

 

If you need anything else just let everyone know.

Renewable energy jokes never get old.
Peter E
Super User
Super User
May 29, 2025

I've seen issues surrounding the installation of an EV cable where an installer has refused to do trenching because they weren't qualified to do that (it was the only viable route) so the trenching / ducting / cable installation was done by a separate contractor who had the required competencies and the the EVSE installer did the rest by installing the EVSE, connecting up the cable ends, testing and commissioning.

Reducing my yearly fossil fuel usage with an EV (-900 litres petrol), A2AHP (-8,700 kWh gas) and Timed Immersion heater (-1,500 kWh gas)
Rank 7
May 29, 2025

I can understand the reluctance due to safety considerations, but trenching is out of the question as it would cost more than the entire solar/battery cost. 

The catenary already exists so it's a matter of securing the cable and making the connections at either end. The sticking point is that the catenary is 4m in the air so Working at Height regulations apply.

I'm toying with the idea of using a local electrician.  Any thoughts?

Peter E
Super User
Super User
May 29, 2025

@mikes01666 I wasn't suggesting trenching was a solution I was saying that sometimes one contractor can't do all the work for whatever reason. If you can get someone to arrange for your EVSE cable to be mounted on the catenary (either as it is or strengthened) and get the OVO engineers to do the rest then it may be a solution. This wouldn't be the first time this has happened with an EVSE install.

 

Peter

Reducing my yearly fossil fuel usage with an EV (-900 litres petrol), A2AHP (-8,700 kWh gas) and Timed Immersion heater (-1,500 kWh gas)