I am currently on THTC but with a single tariff for both meters as I don't have storage heaters or any other timed appliances. I am due to have a smart meter installed on Tuesday which I am very pleased about but concerned that the installation will not go ahead because of the 2 consumer units. Do the the installation engineers carry the necessary parts to connect both of these into the meter?
Page 1 / 1
As long as OVO know about your current meter set up then it should be ok. There are a few others who have been through a meter swap. Take a look here
Thanks for that, I have to assume that they know the situation and have the necessary parts, in fact only a couple of Henley blocks are needed to feed both sets of tails into the meter