I am currently on THTC but with a single tariff for both meters as I don't have storage heaters or any other timed appliances.  I am due to have a smart meter installed on Tuesday which I am very pleased about but concerned that the installation will not go ahead because of the 2 consumer units.  Do the the installation engineers carry the necessary parts to connect both of these into the meter?

As long as OVO know about your current meter set up then it should be ok. There are a few others who have been through a meter swap. Take a look here

 


Thanks for that, I have to assume that they know the situation and have the necessary parts, in fact only a couple of Henley blocks are needed to feed both sets of tails into the meter 🤞