Hi, I live in Dundee, Scotland which is a fairly large city, senior citizen currently on pre payment meter THTC and know all about the RTS switch off. Made arrangements with OVO to change over to pay as you go Smart meter, Engineer arrived yesterday and couldn't do the switch as the Smart meter failed to connect, he sent the relevant information to OVO that no installation had been made, what happens next?
Engineer just said let OVO figure it out, can someone help



