Hi, The OVO engineer has refused to install the gas smart meter (there is currently a BG one in situe but the OVO meter is considerably larger. Apparently the "Earth Ground Cable" is preventing the meter being "raised" to install the OVO smart meter in place of the BG one.
Whilst its frustrating that there was no standardisation of the sizes *at the very least*, I have just spoken to an electrician who I used to meet at my networking group and he thought the installer must have been a "wet behind the ears type who didn't want to bother". I have to say I was very surprised that a qualified engineer wouldn't do something as basic as this as part of the installation as it looks like its a simple matter of unscrewing the cable connection and moving it to the back of the pipe.
I've attached pictures - could you tell me what needs doing so that the "fully qualified" engineer can come back and finish the job.
Whilst its frustrating that there was no standardisation of the sizes *at the very least*, I have just spoken to an electrician who I used to meet at my networking group and he thought the installer must have been a "wet behind the ears type who didn't want to bother". I have to say I was very surprised that a qualified engineer wouldn't do something as basic as this as part of the installation as it looks like its a simple matter of unscrewing the cable connection and moving it to the back of the pipe.
I've attached pictures - could you tell me what needs doing so that the "fully qualified" engineer can come back and finish the job.
- smart
- meter
- smart meter
- smart meters
- appointment
- meter exchange
- gas meter
- engineers
- engineer
- electricity meter
- failed install
- smets2
- smart meter exchange
- earthing
- smart meter installation
- ovo engineer
- earth cable
- failed appointment
- SMETS1 SMETS2
- engineer visit
- smart meter booking
- aborted
- engineers appointment
- engineer job
- engineers revist
- aborted installation
- smart meter device