I reported my Smart Meter was not working in July last year. Nothing has been done about it, though every month I get an email message about the need to supply readings, which is kind of annoying. The screen on the meter is dead so not even manual readings are possible. When chasing some action on this I received a reply in November saying there was a queue for meters to be fixed, but I would be notified as soon as an engineer was available. As it is now April, it must be some long queue.
Best answer by Amy_OVO
View original