I've recently had solar panel and battery installed but the local Welsh Dno imposed a limit of 2k on the export, which sounds very low.
Can they do that I thought they could only impose a limit from 3.6 upwards?
I've recently had solar panel and battery installed but the local Welsh Dno imposed a limit of 2k on the export, which sounds very low.
Can they do that I thought they could only impose a limit from 3.6 upwards?
Best answer by Chris_OVO
Hi
I reached out to our Renewables team and asked them for some thoughts on this. This is what they came back with:
“The DNO only usually limit export below 3.68kW when there's already an existing generator (usually PV inverter) on site and they are looking at the total export limit. Without knowing the full detail it's difficult to comment much further”
I think speaking with the DNO directly would be a good idea if you haven’t already. You can find the list of DNO and their contact information here.
Keep us updated if you find out any more information.