When I switched to OVO in 2017, I was told that my old "smart" meters - installed by SSE in 2016 - were of an older type, not compatible with other providers. So I was left with "dumb" meters for more than a year. Then OVO offered to install what I believed were second generation "smart" meters - which would be compatible with other energy providers.

I now realise this is not the case. The meters OVO installed in Sept 2018 are first gen and not compatible with other providers. However, they are capable of being updated to SMETS2 - supposedly starting mid-2019 and completing sometime in 2020.

This leads me to conclude that OVO replaced the old SSE meters because they were early first gen models, not capable of being updated to SMETS2.

Later this year, when I switch from OVO to a new supplier, I will be left with "dumb" meters again - until such time as the upgrade is rolled out. Oh joy.

My experience, in summary:
Jan 2016 - Traditional "dumb" gas and electric meters replaced by SSE with "smart" meters.
Jun 2017 - I switch to OVO and the "smart" meters are rendered "dumb".
Sep 2018 - OVO replace the SSE meters with upgradeable SMETS1 meters but the gas meter has, in effect, been a "dumb" meter since the day it was installed.
Jun 2019 - When I switch to a new provider, I will be left with two "dumb" meters again.
2019/20 - SMETS1 meters will be upgraded to SMETS2 and I should have working "smart" meters
  1. Dumb to smart
  2. Smart to dumb
  3. Dumb to smart - but one is effectively dumb
  4. Smart to dumb
  5. Dumb to smart
Okay, the situation may not be as mad as I thought. More like a shambles. I am left feeling it is me who is dumb - dumb for ever believing that "smart" meters might be a good idea. Reading this article, I am not alone...

This Is Money - Smart Meter Gone Dumb

Hi there
You are very much not alone, I have to agree with you the smart meter roll out up until smets2 is a bit of a fumble in the dark, it's took a while... Too long but now on the right tracks.
Userlevel 2
Badge
We has our SMETS2 gas and electricity meters fitted on Friday.

Making the decision to get the upgrade and preparing for it was the original reason I joined this Ovo forum and what led me to @Transparent‘s excellent thread.

Having just re-read all 5 pages (!!) I think we have something to add to the knowledge base to help others thinking about making the switch and even to help @Transparent with the issues he is (still?) experiencing with his smart gas meter.

However, I’m going to split this over a few posts, as I wrote the whole thing up last night in one long post - complete with photos - and (irony of ironies) the battery on my phone died just before I hit send and I lost the lot.

so, in between Sunday admin tasks, I will walk through our installation experience and the first 48 hours.

for background, we had fully dumb meters on a house that was built in 2008, we live in a small rural village but do have good mobile signal on most networks. Our house has solar panels but we don’t have a battery (yet). Whilst researching batteries (which I will post about on another thread soon) I have discovered that, despite being a family with normal to above average levels of tech, we are light users: 5-7kWh a day without solar.

More to follow........
Userlevel 2
Badge
Part 2 of our SMETS2 installation.

on the day of the installation I went and provided a meter reading via the app and also took photos of the meters so I have an easy reference of the previous installation, meter numbers (shown on the meter casing) and the meter readings themselves. Can’t see I would need that with Ovo but with our previous energy supplier E.On there is no way I would trust in either their app or their admin.

Our installation engineer called just after the start of the period we had booked for and said he was 15 mins out. He arrived on time, in an Ovo vehicle and Ovo uniform and identified himself. Everything you would expect. He warned us that the power would interrupted, asked to see the boiler, meters and consumer unit. He asked us to turn any appliances that might be sensitive to power interrupt off and asked us to turn the boiler off as well.

Then he cracked on. This is worth noting if you interested in seeing what they do and monitoring the installation as it was done in less than 30 mins. Literally blink and you’ll miss it.

Between us and the installer we fired everything back up, he showed us the meter installation. He had done all his checks and taken all his photos and then he talked us through the IHD.

Just so he gets the credit, he said that working for Ovo was great and that they are a fantastic employer 😉.

The installer was polite and professional throughout, explained what he was going to do and what he had done at each stage. Basically a great ambassador for the company.

i would observe that, as @Transparent has said, they arrive with the job detailed and will only do that job, so more complex scenarios requiring on the job initiative where other variants of the SMETS2 are required are not going to happen. You will get what they planned.

also his knowledge of the wider technology, the behind the scenes network steps and comms standards was not to the same level you get on this thread from @Transparent.

think of the installation engineer we had as a well trained and competent Kwik Fit fitter. He knew how to do his job quickly and safely and well but isn’t going to run an investigation on that tricky engine management problem that is intermittently causing weird behaviour.

as soon as he was gone I got some photos of the two meter panels and used the menu functions as described to get a screenshot of the data and status immediately after installation.

More on that in part 3.....

(spoiler alert.... looks like we may share our gas meter connectivity problem with @Transparent )
Userlevel 2
Badge
Part 3 of our SMETS2 installation experience.

we are lucky in that we have a meter clamp that provides the solar panel app with usage data.

This is a clever widget that goes around live cable in your electricity meter and works on induced current. See the picture below and note this is our old meter before replacement.



This means we have an independent source of information to assess how accurate and responsive the IHD information is. You should assume that because the information is coming from the meter the usage in Watts should be exactly correct .....and you’d be right!

As you can see in the picture below our usage between midnight and 1700 is measured by both sources as 1.65kWh (delay in taking photos)



Userlevel 3
Badge

think of the installation engineer we had as a well trained and competent Kwik Fit fitter.


I tried but just had visions of him telling you that lots of things needed replacing.
Userlevel 2
Badge
Part 4 of our SMETS2 installation experience.

When I first checked our new electricity and gas meters this is what I found:

We had a bog standard Toshiba SKU 1 cellular (entirely appropriate given our location) on top of the Aclara unit as our electricity meter.

For the gas smart meter we have exactly the same unit as @Transparent.

Electricity meter

The 4 network lights on the SKU1 were flashing at the faster rate indicating that the unit was either attempting connection or doing some kind of upload/download. Mesh light isn’t active for our system as we have good mobile data.



later on the flash rate slowed to the normal 1:50. As I said in the previous post, the IHD for electricity came on line almost straight away with accurate usage in Watts. The cost figures were slightly wrong as the default loaded into the meter is slightly more expensive than our rate. 48 hours later these still haven’t updated on either the meter or the IHD.

However our app has replaced the old meter ID with the new one and has automatically taken the first reading.






basically, apart from the update of the daily and unit rate information, the electricity smart meter is working!

but......

As you can see from the last picture, if only the same were true of the gas meter.

more on that in part 5!
Userlevel 2
Badge

think of the installation engineer we had as a well trained and competent Kwik Fit fitter.I tried but just had visions of him telling you that lots of things needed replacing.


not my best metaphor, but I was typing while herding children so that’s my excuse matrix.

He definitely didn’t try and do that!

A particularly professional Kwik fit fitter with a strong morale compass?
Userlevel 5
Badge
Thank you so much for sharing @So much for subtlety, this first hand run down will be invaluable for other customers!

☺
Userlevel 7
Badge +3
Thanks for all that @So much for subtlety.

You wrote:
The cost figures were slightly wrong as the default loaded into the meter is slightly more expensive than our rate. 48 hours later these still haven’t updated on either the meter or the IHD.

This is the very last part of the commissioning process, and could take up to 5 weeks. I still don't understand why.

Possibly it only gets done when OVO's internal Billing Team actually switch your invoicing across to the data-stream incoming from DCC.

Can @Amy_OVO please wander across the other side of the room and ask one of the techies what the answer is please?!
Userlevel 2
Badge
Ok so here’s part 5.....

which is where is gets interesting (and where hopefully @Transparent tells me how he managed to fix this / get it fixed.)

@Darran_OVO @Nancy_OVO @Eva_OVO please have a look at this as say whether or not this is what we should expect or just unlucky that both @Transparent and I have experienced the same issue.

its now 4 days since the installation and 2.5 working days if you include Friday afternoon.

the electricity meter continues to both talk to the IHD and accurately communicate daily readings back to Ovo that show in the app.

But the gas meter in the Ovo app has not updated its MPAN number and the last reading is still the one I did just prior to installation.

when I check the displays and work through the menus I see the following:


So the temperature was correct! And the date and time!

there were lots of error messages in the event log:


Plus alert codes: 0x8161, ...145, ...183, ....161, ...154 repeated broadly equally over the 33 error messages shown in the event log as of Sunday night.


It seems to be accurately measuring gas and it thinks it’s connected tO something but connected to what? remember @Transparent‘s point about connected to electricity meter as it needs to be or connected to the IHD which is connected to the electricity meter.

When I get home later this week I plan to conduct a little test and turn off the IHD and then check the gas meter to see if it still thinks it’s connected.

Com version is showing 3.10.7, firmware version 04:09:15, firmware rev 19093, boot firmware version 01:10:17

final screenshot:



So, it’s working as a Meter, it’s connected to something and it’s managed to get its date and time. But there are a whole load of error messages and to me it looks like a copy and paste of circumstances that led to @Transparent having a replacement meter.

Bottom line it’s not talking to Ovo yet and so it’s not smart in the most basic sense and CRITICALLY even providing a manual reading is going to be tricky as the MPAN is now wrong and providing a meeting reading of 2 or 3 when the last one was 6000ish will probably result in a divide by zero moment.

so the question for @Transparent and the wider team is, did the meter replacement fix his issue? Was it necessary to replace the meter to fix it (or did something else occur in parallel / afterwards that would have fixed it replacement or not)? If it hasn’t fixed it what should we and others like us do to get it fixed? If no one knows how to fix it what should we do to gather data and evidence and who should we contact/ be sending it to?

how do I provide meter readings for gas when the smart meter isn’t and the new meter details are registered and the readings won’t match??
Userlevel 2
Badge
Part 6 - a happy ending.

And then, on the 5th day there was connection!! (Maybe - standby for a post credits scene)



The first and only reading showing is 30 Aug as 0000 which was the installation date.

at this stage I don’t know if this has been done manually or actually means the meter has connected.

as I Pointed out in post 5, if there is a problem with the gas meter connecting and Ovo didn’t intervene to update the meter MPAN and set the reading the zero, I wouldn’t even be able to provide manual gas readings.

i will know by tomorrow whether this manually entered by tomorrow. If it’s connected the first reading will auto update at midnight.
Userlevel 5
Badge
Keep us updated, @So much for subtlety!
Userlevel 2
Badge
Part 7 - The final post credits scene and a happy ending.

ok, so installation day +6 and the final pieces dropped into place with our SMETS2 installation.

As I said in part 6, On Tuesday (installation +4) we noticed on the Ovo app, that the reading history for gas had been wiped and the only entry was for 30 Aug (day of installation) with a reading of 00000. What I hadn’t noticed at first was the that meter MPAN was wrong for this reading and still showed our old
dumb meters MPAN.

today (Thursday - installation day +6) we noticed on the Ovo app that a) the meter MPAN had updated and b) the first auto reading had been taken! Very exciting.

when we got home the IHD is now providing data for both electricity and gas.

So, part 7 is the end (barring some future failure) and that is our SMETS 2 installation story!

Things I would observe with hindsight. Most people probably aren’t going to go out and start digging through the menus on meters. My suggestion is that most people are going to look at their IHD and the Ovo app.

I think more more information could be provided on timescales that things will happen and how this will manifest in the Ovo app in particular. Something as simple as please let us know via this website or through a dedicated upgrade tab in the app if you haven’t seen this change by x days post installation. This would get the customers flagging problem installations to Ovo so they can focus the customer service.

so I would tweak the book and written material/ emails that accompanies the switch to provide customers guidance on the indicators that it’s all progressing ok, update and tighten the installation engineers script to back this up and implement some changes to the app, that are enabled when a customer has been upgraded, to help them a) not fret unnecessarily about time passing or things changing/not changing and b) help Ovo spot issues and intervene before it generates negative customer perception.

All the stuff above is icing on the cake in our case as I suspect many people don’t care about stats, tech and data as much as we do and also it only took 6 days to sort itself out!
Userlevel 5
Badge
YAY🎉 A happy ending is what we like to see!

Thanks so much for sharing your journey, @So much for subtlety!

I think you have raised some really good feedback, that are pretty simple to put into action, I'll ensure they are passed on!

Thanks!
Userlevel 7
Badge +3
About 15 days ago my Communications Hub indicators changed to have no flashes at all from the WAN or MESH indicators. With no link to the outside world, it wasn't possible for OVO in Bristol to continue downloading code updates whilst we tried to resolve problems.

Following discussions with @BenS_OVO I was hopeful that all we'd need was for the Communications Hub to be re-booted. (A reboot of a Toshiba Comms Hub is done by removing its power for 3 minutes) But alas, it transpired that it required much more than that to re-establish communications with DCC.

So... I've now had another visit from an OVO Engineer, and a complete change of all four SMETS2 devices on Weds 18th Sept.

It took about 5 hours before the Gas Meter eventually started sending readings which could be displayed on the new Chameleon. I now know that this is quite normal, albeit disconcerting for customers because they can't be shown the full functionality of their IHD.

It will take another month before I get to see usage graphs and Smart readings appear on the My OVO page.

And if that is successful, it will be a laborious task for someone in OVO's Billing Dept to work out what I really owe for the last six months since the first SMETS2 installation on 11th March.

To be continued.... 😐

Hi.  I am tempted to get the smart meter, SMETS2, installed as now if I change supplier in the future this meter can still be used with my new supplier, and OVO are giving me £50 off my bill.  Has anyone got one of these new meters and would you recommend them.  Thanks.

Userlevel 5
Badge

You’ll find all the info you need above, @Khristyne and plenty of members with SMETS2 meters that will be happy to offer some insight I’m sure. 

SMETS2 @Transparent has a endless pool of knowledge! 

Cheers!

I had a smart meter installed on 23 October.  The installation could not be completed as the OVO network was down, meaning that the initiation process could not take place.  The engineers told me that this was not an uncommon problem.  They reported the issue and moved on to another job.

I have not heard from OVO customer services since regarding a date for completion of the job.  Indeed I have not had even had an acknowledgement that the job is in an incomplete state,   The smart meter booking pages show the original booking but do not cater for incomplete installs.  I emailed OVO help but got a nonsense answer which probably closed the ticket but didn’t help me.  How long will I have to wait ?  Are other customers having the same problem?

 

Keith

Userlevel 5

It seems strange you haven’t heard back about this yet, @KeithC. We’ll need to see whether this is something we can resolve remotely or if an engineer visit is required.

 

We’d be more than happy to look into this, send us a message on Facebook or Twitter you’ll need to confirm your name, DoB and account number. 

Userlevel 7
Badge +3

It’s most likely that your situation, @KeithC,  doesn’t fit within the “boxes on OVO’s check-list”!

I suggest you simply email them, including your name & address, account number and details as you’ve just posted above. That means you retain a date/time-stamped copy of when you formally notified them of the problem.

I expect they’ll handle it as if it’s within the Complaints Procedure, and respond to you within 5 working days.

I had a smart meter installed on 23 October.  The installation could not be completed as the OVO network was down, meaning that the initiation process could not take place.  The engineers told me that this was not an uncommon problem.  They reported the issue and moved on to another job.

 

Sorry to bust in like this, I’m a EON customer, come across this thread because it has some very valuable information.  I just had the smart meter fitted a week ago, similar story to Keith.  Called EON CS, they told me it was a DCC network issue and affecting a lot of networks, including BG. They told me to wait until the DCC network is up and running properly, no ETA.  Hopefully, DCC can fix their issue quickly.

Userlevel 7
Badge +3

Everyone’s welcome here @dchao. You don’t need to be an [color=#009030]OVO[/color] customer.

[color=#40b0b0]EON[/color] are correct in that any network outage by [color=#d0b030]DCC[/color] and their telecommunications partners ([color=#b02030]Telefonica[/color] and [color=#C0A980]Arqiva[/color]) will affect the entire [color=#b09020]National Smart Meter Network[/color].

Just bear in mind that there are other reasons that the network may be down… such as [color=#d0b030]DCC[/color]/GCHQ detecting a potential cyber attack. It is important that this encrypted network remains secure and prevents our domestic energy supply systems being compromised.

In similar fashion to the National Grid employee who decided to sacrifice a quarter of the electricity supply network in order to prevent the system collapsing on Fri 9th June, [color=#d0b030]DCC[/color] will be prepared to take strong action if they believe their network is threatened.

I’m not saying that is what has happened on this occasion, but we need to trust [color=#d0b030]DCC[/color] to get things right rather than imagine they might be at fault. We’re on the same side!

I had a smart meter installed on 23 October.  The installation could not be completed as the OVO network was down, meaning that the initiation process could not take place.  The engineers told me that this was not an uncommon problem.  They reported the issue and moved on to another job.

 

Sorry to bust in like this, I’m a EON customer, come across this thread because it has some very valuable information.  I just had the smart meter fitted a week ago, similar story to Keith.  Called EON CS, they told me it was a DCC network issue and affecting a lot of networks, including BG. They told me to wait until the DCC network is up and running properly, no ETA.  Hopefully, DCC can fix their issue quickly.

 

 

Pretty much what she'll told me but my post got deleted I think

Reply